Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: JWG CONSTRUCTION, LLC

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of JWG CONSTRUCTION, LLC in 801 PALE SAN VITORES RD, TAMUNING, GU 96913 (NAICS 238350). OSHA activity number 345355408.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch JWG Construction, LLC — free Get an email when a new federal OSHA severe-injury report for JWG Construction, LLC is published. One employer, no account, unsubscribe in one click.
Site address
801 PALE SAN VITORES RD
City
TAMUNING
State
GU
ZIP
96913
Mailing
PO BOX 11378, TAMUNING, GU 96931
Inspection type
Unprogrammed Other (I)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238350
Employees
9
Ownership type
A

3 citations on file for this inspection.

1926.404 F06

Serious Gravity 1 1 instance 2 exposed
Issued
Jul 29, 2021
Penalty
Initial $1,492 · Current $1,044 Reduced
29 CFR  1926.404(f)(6):The path to ground from circuits, equipment, or enclosures was not permanent and continuous:  Crowne Plaza Resort hotel renovation project, Club Lounge: The industrial fan electrical cord was missing the grounding pin. Employees were exposed to electrical and fire hazards.
Recent events (2)
  • — I (S) $1044.4
  • — Z (S) $1492

1926.405 G02 III

Serious Gravity 1 1 instance 1 exposed
Issued
Jul 29, 2021
Penalty
Initial $1,492 · Current $1,044 Reduced
29 CFR  1926.405(g)(2)(iii):Flexible cords were not used in continuous lengths without splice or tap:  Crowne Plaza Resort hotel renovation project, Room 816:  A drill with a spliced power cord was used to mix mortar for setting tiles. Employees were exposed to electrical and fire hazards.
Recent events (2)
  • — I (S) $1044.4
  • — Z (S) $1492

1926.405 G02 IV

Other-than-serious 2 instances 3 exposed
Issued
Jul 29, 2021
Penalty
Initial $0 · Current $0
29 CFR  1926.405(g)(2)(iv): Flexible cords were not connected to devices and fittings so that strain relief is provided to prevent pull from being directly transmitted to joints or terminal screws:  a) Crowne Plaza Resort hotel renovation project, Reception Area: The outer insulation of a flexible cord that was powering a scissor lift had separated from the plug, exposing the conductors to strain. Employees were exposed to electrical and fire hazards.  b) Crowne Plaza Resort hotel renovation project, Club Lounge: The outer insulation of a flexible cord that was powering an industrial fan had separated from the plug, exposing the conductors to strain. Employees were exposed to electrical and fire hazards.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View JWG Construction, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345355408.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.