Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: MODERN INTERNATIONAL INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of MODERN INTERNATIONAL INC. in US MARINE CORPS CAMP BLAZ POLICE STATION RENOVATION, DEDEDO, GU 96912 (NAICS 238210). OSHA activity number 345518484.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Modern International INC. — free Get an email when a new federal OSHA severe-injury report for Modern International INC. is published. One employer, no account, unsubscribe in one click.
Site address
US MARINE CORPS CAMP BLAZ POLICE STATION RENOVATION
City
DEDEDO
State
GU
ZIP
96912
Mailing
PO BOX 9070, TAMUNING, GU 96931
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238210
Employees
5
Ownership type
A

2 citations on file for this inspection.

1926.95 C

Other-than-serious 1 instance 2 exposed
Issued
Feb 3, 2022
Penalty
Initial $0 · Current $0
29 CFR  1926.95(c): Personal protective equipment was not of safe design and construction for the work to be performed:   Police Station Project:  Employees were observed using cotton work gloves while using wet concrete containing Portland cement.  Wet concrete residue was observed on a worker's forearms and hands.  Employees are exposed to skin irritation or and chemical burn hazards.
Recent events (1)
  • — Z (O) $0

1926.451 B01 I

Other-than-serious 1 instance 5 exposed
Issued
Feb 3, 2022
Abate by
Feb 15, 2022
Penalty
Initial $0 · Current $0
29 CFR  1926.451(b)(1)(i):Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) shall be installed so that the space between adjacent units and the space between the platform and the uprights is no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary (for example, to fit around uprights when side brackets are used to extend the width of the platform).  Front of the project: Scaffold planking used to access the project had measured gaps in excess of 1"  between various sections of planking in the front of the project.  The largest gap was 4.5".  Employees were exposed to tripping hazards.
Recent events (1)
  • — Z (O) $0

View Modern International INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345518484.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.