DE FOREST, WI —
OSHA Inspection: GL CONSTRUCTION OF MADISON LLC
Federal Agency inspection · Safety discipline
At a glance
On , OSHA opened a federal Agency safety inspection of GL CONSTRUCTION OF MADISON LLC in 4671-4683 BELLFLOWER DRIVE, DE FOREST, WI 53532 (NAICS 238160). OSHA activity number 345910178.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- GL CONSTRUCTION OF MADISON LLC
- Site address
- 4671-4683 BELLFLOWER DRIVE
- City
- DE FOREST
- State
- WI
- ZIP
- 53532
- Mailing
- 6659 WAGNERS VINEYARD TRL, SUN PRAIRIE, WI 53590
What kind of inspection was it?
- Inspection type
- Federal Agency (M)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 6
- Ownership type
- A
Citations
11 citations on file for this inspection.
1903.19 C01
- Issued
- Jan 12, 2024
- Abate by
- Feb 21, 2024
- Penalty
- Initial $413 · Current $413
General-duty citation text
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: The employer failed to submit certification of abatement within 10 calendar days of the abatement date for: Citation 1 Item 1, Citation 1 Item 2, Citation 1 Item 3, Citation 1 Item 4, Citation 1 Item 5, Citation 1 Item 6, Citation 1 Item 7, Citation 1 Item 8 and Citation 1 Item 9.
Recent events (1)
- — Z (O) $413
1903.19 D01
- Issued
- Jan 12, 2024
- Abate by
- Feb 21, 2024
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1903.19(d)(1): The employer did not submit to the Agency documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required. The employer failed to submit documentation of abatement within 10 days of the abatement date for Citation 1 Item 4.
Recent events (1)
- — Z (O) $0
1926.20 B02
- Issued
- Sep 23, 2022
- Abate by
- Sep 28, 2023
- Penalty
- Initial $11,396 · Current $9,664 Reduced
General-duty citation text
29 CFR 1926.20(b)(2):The employer did not initiate and maintain programs which provided for frequent and regular inspections of the job site, materials and equipment to be made by a competent person(s). a) On or about April 20, 2022, at the previously addressed inspection site, employees were framing and installing wood walls on the second level of a residential building outdoors in high wind conditions. Frequent and regular inspections of the job site, materials and equipment were not completed. Inspections of the operation of installing and bracing walls, the equipment used such as the crane and rigging and/or attaching of the walls to the crane via a sling, and inspections of the walking/working surfaces were not completed. Employees were exposed to struck by and fall hazards. Abatement certification is required for this item in accordance with the requirements of 29 CFR 1903.19(c).
Recent events (3)
- — F (S) $9664
- — C (S) $11396
- — Z (S) $11396
1926.100 A
- Issued
- Sep 23, 2022
- Abate by
- Sep 28, 2023
- Penalty
- Initial $3,419 · Current $2,902 Reduced
General-duty citation text
29 CFR 1926.100(a):Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets. a) On or about April 20, 2022, at the previously addressed inspection site, employees framing, installing and bracing wood walls of a residential building did not use protective helmets to protect against struck by hazards, or protection from head injury from impact, or falling or flying objects. Abatement certification is required for this item in accordance with the requirements of 29 CFR 1903.19(c).
Recent events (3)
- — F (S) $2902
- — C (S) $3419
- — Z (S) $3419
1926.251 A02 II
- Issued
- Sep 23, 2022
- Abate by
- Sep 28, 2023
- Penalty
- Initial $3,419 · Current $2,902 Reduced
General-duty citation text
29 CFR 1926.251(a)(2)(ii): Rigging equipment was loaded in excess of its rated capacity. a) On or about April 20, 2022, at the previously addressed inspection site, rigging equipment (tow strap) was loaded in excess of its rated capacity while lifting a wood framed wall upright from the floor because the attached label informs the tow strap user not to use for lifting, exposing employees to struck by and crushing hazards. Abatement certification is required for this item in accordance with the requirements of 29 CFR 1903.19(c).
Recent events (3)
- — F (S) $2902
- — C (S) $3419
- — Z (S) $3419
1926.251 A04
- Issued
- Sep 23, 2022
- Abate by
- Sep 28, 2023
- Penalty
- Initial $4,786 · Current $4,068 Reduced
General-duty citation text
29 CFR 1926.251(a)(4):Special custom design lifting accessories for material handling were not marked to indicate the safe working load(s). a) On or about April 20, 2022, at the previously addressed inspection site, the tow strap and 2x6 wood boards attached to a framed wall were not marked to indicate safe working loads for lifting, exposing employees to struck by hazards. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Recent events (3)
- — F (S) $4068
- — C (S) $4786
- — Z (S) $4786
1926.501 B13
- Issued
- Sep 23, 2022
- Abate by
- Sep 28, 2023
- Penalty
- Initial $2,735 · Current $2,324 Reduced
General-duty citation text
29 CFR 1926.501(b)(13):Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b). a) On or about April 20, 2022, at the previously addressed inspection site, employees framing, installing and bracing wooden walls on the second level of a residential building were exposed to falls of six feet or more to the lower levels because there was no fall protection for openings in the floor and at the sides of the floor. Abatement certification is required for this item in accordance with the requirements of 29 CFR 1903.19(c).
Recent events (3)
- — F (S) $2324
- — C (S) $2735
- — Z (S) $2735
1926.753 D02 III
- Issued
- Sep 23, 2022
- Abate by
- Sep 28, 2023
- Penalty
- Initial $3,419 · Current $2,902 Reduced
General-duty citation text
29 CFR 1926.753(d)(2)(iii): All loads shall be rigged by a qualified rigger. a) On or about April 20, 2022, at the previously addressed inspection site, a wood framed wall lifted by a crane was not rigged by a qualified rigger. Abatement certification is required for this item in accordance with the requirements of 29 CFR 1903.19(c).
Recent events (3)
- — F (S) $2902
- — C (S) $3419
- — Z (S) $3419
1926.1412 F01
- Issued
- Sep 23, 2022
- Abate by
- Sep 28, 2023
- Penalty
- Initial $2,051 · Current $1,743 Reduced
General-duty citation text
29 CFR 1926.1412(f)(1)The equipment was not inspected at least every 12 months by a qualified person in accordance with paragraph (d) of this section. a) On or about April 20, 2022, at the previously addressed inspection site, the Terex Boom Truck BT4792 crane used to lift framed wood walls was not inspected at least every 12 months by a qualified person. Abatement certification is required for this item in accordance with the requirements of 29 CFR 1903.19(c).
Recent events (3)
- — F (S) $1743
- — C (S) $2051
- — Z (S) $2051
1926.1417 N
- Issued
- Sep 23, 2022
- Abate by
- Sep 28, 2023
- Penalty
- Initial $3,419 · Current $2,902 Reduced
General-duty citation text
29 CFR 1926.1417(n):The competent person must adjust the equipment and/or operations to address the effect of wind, ice, and snow on equipment stability and rated capacity. a) On or about April 20, 2022, at the previously addressed inspection site, the operation of framing, installing and bracing wood framed residential building walls was not adjusted by a competent person to address the effects of high winds of up to 40 mph. A wall over tipped and struck an employee following a high wind gust during the bracing and installation of the wall. Abatement certification is required for this item in accordance with the requirements of 29 CFR 1903.19(c).
Recent events (3)
- — F (S) $2902
- — C (S) $3419
- — Z (S) $3419
1926.1428 A
- Issued
- Sep 23, 2022
- Abate by
- Sep 28, 2023
- Penalty
- Initial $3,419 · Current $2,947 Reduced
General-duty citation text
29 CFR 1926.1428(a):The employer of the signal person must ensure that each signal person meets the Qualification Requirements (paragraph (c) of this section) prior to giving any signals. a) On or about April 20, 2022, at the previously addressed inspection site, the employer did not determine if the signal person met the qualification requirements prior to signaling the crane operator. Abatement certification is required for this item in accordance with the requirements of 29 CFR 1903.19(c).
Recent events (3)
- — F (S) $2946.55
- — C (S) $3419
- — Z (S) $3419
More inspections at GL Construction of Madison LLC
View GL Construction of Madison LLC's full OSHA safety record →
More inspections in this industry (NAICS 238160)
More inspections in WI
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345910178.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.