OSHA Inspection: C.K. KING BUILDERS, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of C.K. KING BUILDERS, LLC in THATCHER LANE, LOT #124, LITITZ, PA 17543 (NAICS 236115). OSHA activity number 345912547.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch C.K. King Builders, LLC — free Get an email when a new federal OSHA severe-injury report for C.K. King Builders, LLC is published. One employer, no account, unsubscribe in one click.
Site address
THATCHER LANE, LOT #124
City
LITITZ
State
PA
ZIP
17543
Mailing
984 MAY POST OFFICE ROAD, STRASBURG, PA 17579
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236115
Employees
3
Ownership type
A

6 citations on file for this inspection.

5(a)(1)

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Aug 8, 2022
Abate by
Sep 1, 2022
Penalty
Initial $4,972 · Current $0 Reduced
OSH ACT of 1970 Section (5)(a)(1): The employer did not furnish employment and a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to fall hazards while working from an elevated platform supported on the forks of a rough terrain forklift:  a) Job Site - Employees were observed working from an elevated platform supported on the forks of a JCB 506B Loadall rough terrain forklift. The platform width was greater than the width of the truck (measured across the load bearing tires, plus 10 inches on either side), on or about April 21, 2022.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $4972

1926.451 A06

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Aug 8, 2022
Abate by
Sep 1, 2022
Penalty
Initial $4,972 · Current $0 Reduced
29 CFR  1926.451(a)(6): Scaffolds were not designed by a qualified person and were not constructed and loaded in accordance with that design.   a) Job Site - Employees were observed working from an elevated platform supported on the forks of a JCB 506B Loadall rough terrain forklift 11 feet high above the ground. The platform measured approximately 16 feet long x 3 feet 9 inches wide and had not been designed by a qualified person, on or about April 21, 2022.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $4972

1926.451 C02 V

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Aug 8, 2022
Abate by
Sep 1, 2022
Penalty
Initial $4,972 · Current $0 Reduced
29 CFR  1926.451(c)(2)(v): Fork-lifts were used to support scaffold platforms while the entire platform was not attached to the fork and the fork-lift was moved horizontally while the platform was occupied:   a) Job Site - Employees were observed working from an elevated platform supported on the forks of a JCB 506B Loadall rough terrain forklift and the platform was not securely attached to the forklift, exposing the employees to an approximate 11 foot fall hazard to the ground below, on or about April 21, 2022.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $4972

1926.451 G01 VII

Deleted Serious Gravity 5 2 instances 2 exposed
Issued
Aug 8, 2022
Abate by
Sep 1, 2022
Penalty
Initial $4,972 · Current $0 Reduced
29 CFR  1926.451(g)(1)(vii): Each employee on a scaffold more than 10 feet (3.1m) above a lower level, not otherwise specified in paragraphs (g)(1)(I) through (g)(1)(vi) of this section, was not protected from falling to that lower level by use of personal fall arrest systems or guardrail systems meeting the requirement of paragraph (g)(4) of this section:  a) Job Site - Employees were observed working from an elevated platform supported on the forks of a JCB 506B Loadall rough terrain forklift which did not have endrails and were exposed an approximate 11 foot fall hazard to the ground below, on or about April 21, 2022.  b) Job Site - Employees were observed working from an elevated platform supported on the forks of a JCB 506B Loadall rough terrain forklift and were standing on a stack of sheathing placing them above the protection of the guardrail exposing them to an approximate 11 foot fall hazard to the ground below, on or about April 21, 2022.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $4972

1926.501 B13

Deleted Serious Gravity 10 2 instances 3 exposed
Issued
Aug 8, 2022
Abate by
Sep 1, 2022
Penalty
Initial $5,801 · Current $0 Reduced
29 CFR  1926.501(b)(13): Each employee engaged in residential construction activities 6 feet (1.8 m)  or more above lower levels was not protected by guardrail systems, safety net systems, personal fall arrest systems, or an alternative fall protection measure under another provision of paragraph 1926.501(b), nor did the employer demonstrate that it is infeasible or creates a greater hazard to use these systems and develop and implement a fall protection plan which meets the requirements of paragraph (k) of section 1926.502:   a) Job Site - Employee(s) installing sheathing to a steep pitched residential roof were not protected from an approximate 20 foot fall hazard to the ground below, on or about April 21, 2022.  b) Job Site - Employee(s) installing sheathing to a steep pitched residential roof were not protected from an approximate 10 foot fall hazard to the floor below, on or about April 21, 2022.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $5801

1926.602 C01 VI

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Aug 8, 2022
Abate by
Sep 1, 2022
Penalty
Initial $4,972 · Current $0 Reduced
29 CFR  1926.602(c)(1)(vi): Industrial truck(s) in use did not meet the applicable requirements of design, construction, stability, inspection, testing, maintenance, and operation, as defined in American National Standards Institute B56.1-1969, Safety Standards for Powered Industrial Trucks:  a) Job Site - Employees were observed working from an elevated platform supported on the forks of a JCB 506B Loadall rough terrain forklift. The operator had dismounted the cab leaving the forks elevated and no one at the controls exposing the employees to an approximate 11 foot fall hazard to the ground below, on or about April 21, 2022.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $4972

View C.K. King Builders, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345912547.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.