OSHA Inspection: BAE SYSTEMS ORDNANCE SYSTEMS INC.

Referral inspection · Health discipline

On , OSHA opened a referral health inspection of BAE SYSTEMS ORDNANCE SYSTEMS INC. in 4050 PEPPERS FERRY RD NW, RADFORD, VA 24141 (NAICS 325920). OSHA activity number 347061988.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch BAE Systems Ordnance Systems INC. — free Get an email when a new federal OSHA severe-injury report for BAE Systems Ordnance Systems INC. is published. One employer, no account, unsubscribe in one click.
Site address
4050 PEPPERS FERRY RD NW
City
RADFORD
State
VA
ZIP
24141
Mailing
4050 PEPPERS FERRY RD NW, RADFORD, VA 24141
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
A
Opened
Closing conference
Last modified
Data loaded
NAICS code
325920
Employees
1200
Ownership type
A

10 citations on file for this inspection.

1910.119 E03 I

Deleted Serious Gravity 5 1 instance 12 exposed
Issued
Apr 23, 2024
Abate by
Jun 3, 2024
Penalty
Initial $9,795 · Current $0 Reduced

Hazardous substances 09261210

29 CFR 1910.119(e)(3)(i): The process hazard analysis (PHA) did not address the hazards of the process:  a) Green Lines, Mix House, Bay 9: On or about February 14, 2024, the employer failed to ensure that the PHA addressed the hazard of electrostatic discharge during the addition of solids (i.e., diphenylamine or DPA) to flammable liquids in the makeup tank.  Static discharge in the presence of a flammable atmosphere can cause a flash fire and expose employees to burn hazards.     ABATEMENT CERTIFICATION REQUIRED
Recent events (3)
  • — F (S) $0
  • — C (S) $9795
  • — Z (S) $9795

1910.119 E03 IV

Deleted Serious Gravity 5 1 instance 3 exposed
Issued
Apr 23, 2024
Abate by
Jun 3, 2024
Penalty
Initial $0 · Current $0

Hazardous substances 01701890

29 CFR 1910.119(e)(3)(iv): The process hazard analysis (PHA) did not address the consequences of failure of engineering and administrative controls:   a) Legacy NC, Selective Catalytic Reduction Unit Area (SCR): On or about February 13, 2024, the employer failed to ensure that the PHA addressed the consequences of a burner management system (BMS) failure.  BMS failures can lead to an uncontrolled release of natural gas and expose employees to fire and explosion hazards.  ABATEMENT CERTIFICATION REQUIRED
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1910.119 F01 II

Other-than-serious Gravity 5 3 instances 16 exposed
Issued
Apr 23, 2024
Abate by
Apr 23, 2026
Penalty
Initial $9,795 · Current $9,795

Hazardous substances 017012101890

29 CFR 1910.119(f)(1)(ii): The employer's written operating procedures did not address the requirements for the operating limits:  a) Green Lines, Mix House, Bay 9: On or about February 14, 2024, the employer failed to address the operating limits in the written operating procedure, 4-02-009B - Preparation of Solvent Mixes, when employees prepared solvent mixtures using the flammable liquid, diethyl ether, in the makeup tank.  The vapors from the flammable liquid used in the solvent mixtures can ignite and expose employees to flash fire hazards.      b) Solvents Area: On or about February 14, 2024, the employer failed to address the operating limits in the written operating procedure, RAD-SV-418 - Transferring Ether Product from T7 to M10, when employees worked with diethyl ether.  Exposure to diethyl ether could lead to serious injury or death from chemical inhalation and fire hazards.  ABATEMENT CERTIFICATION REQUIRED  ABATEMENT NOTE:  The operating limits shall address the consequences of deviation and steps required to correct or avoid deviation.
Recent events (3)
  • — F (O) $9795
  • — C (S) $9795
  • — Z (S) $9795

1910.119 G03

Serious Gravity 5 5 instances 31 exposed
Issued
Apr 23, 2024
Abate by
Apr 23, 2026
Penalty
Initial $9,795 · Current $9,795

Hazardous substances 01701210186018902310

29 CFR 1910.119(g)(3) Training documentation. The employer did not ascertain that each employee involved in operating a process has received and understood the training required by this paragraph. The employer did not prepare a record which contains the identity of the employee, the date of training, and the means used to verify that the employee understood the training:  a) On or about February 13, 2024, the employer failed to document that employees who work as operators adequately understood their training with respect to cross-references within the binders containing operating and other procedures as it relates to control measures to be taken if physical contact or airborne exposure occurs.  ABATEMENT CERTIFICATION REQUIRED
Recent events (3)
  • — F (S) $9795
  • — C (S) $9795
  • — Z (S) $9795

1910.119 F01 III E

Deleted Serious Gravity 5 1 instance 12 exposed
Issued
Apr 23, 2024
Abate by
Jun 3, 2024
Penalty
Initial $0 · Current $0

Hazardous substances 09261210

29 CFR 1910.119(f)(1)(iii)(E): The employer's written operating procedures did not address any special or unique hazards:  a) Green Lines, Mix House, Bay 9: On or about February 14, 2024, the employer failed to address any special or unique hazards in the written operating procedure, 4-02-009B - Preparation of Solvent Mixes, when employees added solids (i.e., diphenylamine or DPA) to flammable liquids in the makeup tank.  The addition of solids to flammable liquids can cause static discharge which ignites flammable vapors and exposes employees to flash fire hazards.      ABATEMENT CERTIFICATION REQUIRED
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1910.119 F01 IV

Other-than-serious Gravity 5 1 instance 12 exposed
Issued
Apr 23, 2024
Abate by
Apr 23, 2026
Penalty
Initial $9,795 · Current $5,875 Reduced

Hazardous substances 09261210

29 CFR 1910.119(f)(1)(iv): The employer's written operating procedures did not address the requirements for the safety systems and their functions:  a) Green Lines, Mix House, Bay 9: On or about February 14, 2024, the employer failed to address the safety systems and their functions in the written operating procedure, 4-02-009B - Preparation of Solvent Mixes, when employees prepared solvent mixtures using the flammable liquid, diethyl ether, in the makeup tank.  The vapors from the flammable liquid used in the solvent mixtures can ignite and expose employees to flash fire hazards.      ABATEMENT CERTIFICATION REQUIRED
Recent events (3)
  • — F (O) $5875
  • — C (S) $9795
  • — Z (S) $9795

1910.119 J04 II

Serious Gravity 5 4 instances 25 exposed
Issued
Apr 23, 2024
Abate by
Apr 23, 2026
Penalty
Initial $9,795 · Current $9,795

Hazardous substances 2310

29 CFR 1910.119(j)(4)(ii): Inspection and testing procedures did not follow recognized and generally accepted good engineering practices (RAGAGEP):  a) The Employer failed to document appropriate inspection protocols as recommended by the original equipment manufacturer for Teflon-lined piping.  ABATEMENT CERTIFICATION REQUIRED
Recent events (3)
  • — F (S) $9795
  • — C (S) $9795
  • — Z (S) $9795

1910.119 J02

Repeat Gravity 5 5 instances 12 exposed
Issued
Apr 23, 2024
Abate by
Apr 23, 2026
Penalty
Initial $57,620 · Current $9,795 Reduced

Hazardous substances 017012102310

29 CFR  1910.119(j)(2): The employer did not establish or implement written procedures to maintain the on-going integrity of process equipment:  a) Legacy NC, C-Line NOx Abatement Facility: On or about October 24, 2023, the employer failed to establish written procedures for maintaining the integrity of controls, including the procedural steps to be followed for the inspection, testing, and calibration of the ammonia gas injection flow loop.  Failure of this control could result in a release of anhydrous ammonia and expose employees to serious injury or death from chemical inhalation and fire hazards.    b) Legacy NC, C-Line NC NOx Abatement Facility: On or about October 24, 2023, the employer failed to establish written procedures for maintaining the integrity of controls, including the procedural steps to be followed in the SCR acid control area for the inspection of the acid concentration diverter valve, scrubber tower dump valve, condensate tank level transmitter, scrubber tower level control valve, fume fan condensate catch box air operate pump or the mass flow meter.  Failure of these controls could result in a release of anhydrous ammonia and expose employees to serious injury or death from chemical inhalation and fire hazards.      c) Legacy NC, C-Line NOx Abatement Facility: On or about October 24, 2023, the employer failed to establish written procedures for maintaining the integrity of process equipment, including the procedural steps to be followed for the cleaning, calibrating, and catalyst replacement on the NOx analyzers.  Failure of this process equipment could result in a release of anhydrous ammonia and expose employees to serious injury or death from chemical inhalation and fire hazards.      d) Legacy NC, C-Line NOx Abatement Facility: On or about October 24, 2023, the employer failed to establish written procedures for maintaining the integrity of process equipment, including the procedural steps to be followed for the inspection and calibration of the fired heater.  Failure of this process equipment could result in a release of natural gas and expose employees to serious injury or death from fire and explosion hazards.  e) Legacy NC, Oleum Tank A, Attached Piping: On or about October 24, 2023, the employer failed to establish written procedures for maintaining the integrity of piping systems, including the steps to be followed for the inspection and testing of the oleum piping system.  Failure of this piping system could result in a release of oleum and expose employees to serious injury or death from chemical inhalation.      f) Legacy NC, Sulfuric Acid Tank B, Attached Piping: On or about October 24, 2023, the employer failed to establish written procedures for maintaining the integrity of piping systems, including the steps to be followed for the inspection and testing of the sulfuric acid piping system.  Failure of this piping system could result in a release of sulfuric acid and expose employees to serious injury or death from chemical inhalation.     ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED  The employer, BAE Systems Ordnance Systems, Inc., was previously cited for a violation of this Occupational Safety and Health Standard, which was contained in OSHA inspection number 1564950, citation number 01, item number 03a, and was affirmed as a final order on June 14, 2022, with respect to a workplace located at 4050 Pepper Ferry Road, Radford, VA 24141.  ABATEMENT NOTE: Written procedures to maintain the on-going integrity of process equipment shall detail how to perform inspections and tests that comply with the employer-selected recognized and generally accepted good engineering practices (RAGAGEP).
Recent events (3)
  • — F (R) $9795
  • — C (R) $57620
  • — Z (R) $57620

1910.119 L01

Other-than-serious 1 instance 25 exposed
Issued
Apr 23, 2024
Abate by
Apr 23, 2026
Penalty
Initial $0 · Current $0

Hazardous substances 0170

29 CFR 1910.119(l)(1): The employer did not implement procedures to manage changes to process chemicals, technology, equipment, and procedures, and changes to facilities that affect a covered process:  a) Legacy NC, NC Nitration Building: On or about October 25, 2023, the employer failed to implement management of change (MOC) procedures for the conversion from anhydrous ammonia to Freon for the brine chilling system which is part of an explosives process.    ABATEMENT CERTIFICATION REQUIRED
Recent events (3)
  • — F (O) $0
  • — C (O) $0
  • — Z (O) $0

1910.1200 F06 II

Other-than-serious 2 instances 29 exposed
Issued
Apr 23, 2024
Abate by
Apr 23, 2026
Penalty
Initial $0 · Current $0

Hazardous substances 12102310

29 CFR  1910.1200(f)(6)(ii): Except as provided in 29 CFR 1910.1200(f)(7) and 29 CFR 1910.1200(f)(8), the employer did not ensure that each container of hazardous chemicals in the workplace was labeled, tagged or marked with the product identifier and words, pictures, symbols, or combination thereof, which provide at least general information regarding the hazards of the chemicals and which, in conjunction with the other information immediately available to employees under the hazard communication program, would provide employees with the specific information regarding the physical and health hazards of the hazardous chemical:  a) Acid Area: On or about October 24, 2023, the employer failed to ensure that the sulfuric acid storage tanks T80, T81, T102, T103, T104, and T105 were appropriately labeled with words, pictures, symbols, or combination thereof that provided at least general information regarding the hazards of the chemicals within them.  b) Solvents Area: On or about October 25, 2023, the employer failed to ensure that the ether storage tanks T6, S9, and S10 were appropriately labeled with words, pictures, symbols, or combination thereof that provided at least general information regarding the hazards of the chemicals within them.  ABATEMENT CERTIFICATION REQUIRED  ABATEMENT NOTE:  Storage tanks are not stationary process containers and are not permitted to utilize the alternative labeling methods (e.g., placards) contained in paragraph (f)(7).
Recent events (3)
  • — F (O) $0
  • — C (O) $0
  • — Z (O) $0

View BAE Systems Ordnance Systems INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347061988.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.