Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: UNITED REFINING COMPANY

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of UNITED REFINING COMPANY in 15 BRADLEY STREET, WARREN, PA 16365 (NAICS 324110). OSHA activity number 347473035.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch United Refining Company — free Get an email when a new federal OSHA severe-injury report for United Refining Company is published. One employer, no account, unsubscribe in one click.
Site address
15 BRADLEY STREET
City
WARREN
State
PA
ZIP
16365
Mailing
P.O. BOX 780, WARREN, PA 16365
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
324110
Employees
600
Ownership type
A

6 citations on file for this inspection.

1910.119 F01

Serious Gravity 5 1 instance 34 exposed
Issued
Sep 5, 2024
Abate by
Dec 6, 2024
Penalty
Initial $10,578 · Current $7,405 Reduced
29 CFR 1910.119(f)(1): The employer did not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information:  a.) United Refining Company, located at 15 Bradley Street, Warren PA, FCC Unit: On or about 3/5/24, prior to initiating a leak repair at the Everlast valve, the employer failed to implement FCC Unit Emergency Procedures when they failed to shut down the unit for emergency repairs. Employees suffered injuries including but not limited to burns and respiratory system irritation after in-process catalyst was released as employees loosened fittings.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement
Recent events (2)
  • — I (S) $7404.6
  • — Z (S) $10578

1910.119 F01 III B

Serious Gravity 5 1 instance 34 exposed
Issued
Sep 5, 2024
Abate by
Dec 6, 2024
Penalty
Initial $0 · Current $0
29 CFR 1910.119(f)(1)(iii)(B): The employer did not develop and implement written operating procedures that provided clear instructions for safely conducting activities involved in each covered process consistent with the process safety information that addressed health and safety considerations, such as precautions necessary to prevent exposure, including engineering controls, administrative controls, and personal protective equipment:  a.) United Refining Company, located at 15 Bradley Street, Warren PA: the employer failed to address the required personal protective clothing in written operating procedures including but not limited to, FCC Unit Emergency Procedures, Fry Panning Procedures, and Opening Line Procedures.  On March 5, 2024, employees suffered injuries including but not limited to burns and respiratory system irritation after in-process catalyst was released as employees loosened fittings.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.119 F01 III C

Serious Gravity 5 1 instance 34 exposed
Issued
Sep 5, 2024
Abate by
Dec 6, 2024
Penalty
Initial $0 · Current $0
29 CFR 1910.119(f)(1)(iii)(C): The employer failed to ensure that the process safety management Standard Operating Procedures included safety and health consideration such as control measures to be taken if physical contact or airborne exposure occurs:  a) United Refining Company, located at 15 Bradley Street, Warren PA: the employer failed to address the control measures to be taken if physical contact or airborne exposure occurs in written operating procedures including but not limited to, FCC Unit Emergency Procedures, Fry Panning Procedures, and Opening Line Procedures.  On March 5, 2024, employees suffered injuries including but not limited to burns and respiratory system irritation after in-process catalyst was released as employees loosened fittings.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.119 F04

Serious Gravity 5 1 instance 34 exposed
Issued
Sep 5, 2024
Abate by
Dec 6, 2024
Penalty
Initial $10,578 · Current $7,405 Reduced
29 CFR 1910.119(f)(4): The employer did not develop and implement safe work practices to provide for the control of hazards during operations such as lockout/tagout; confined space entry; opening process equipment or piping; and control over entrance into a facility by maintenance, contractor, laboratory, or other support personnel:  a) United Refining Company, located at 15 Bradley Street, Warren PA, FCC Unit: On or about 3/5/24, prior to initiating a leak repair at the Everlast valve, the employer failed to implement the Fry Panning procedure Section 2.1, and Lockout/Tagout (Control of Hazardous Energy Sources) Section 4.3 Energy Isolation Procedure, when they did not prepare the equipment and develop an energy isolation plan prior to installing a fry pan on the Everlast valve and FCC Regenerated Standpipe.  Employees suffered injuries including but not limited to burns and respiratory system irritation after in-process catalyst was released as employees loosened fittings.  b) United Refining Company, located at 15 Bradley Street, Warren PA, FCC Unit: On or about 3/5/24 and times prior thereto, prior to initiating a leak repair at the Everlast valve, the employer failed implement the Line Breaking Procedure when they did not shutdown, isolate and depressurize the equipment associated with the Everlast valve and FCC Regenerated Standpipe in an orderly manner in accordance with FCC Unit Emergency Procedures. Employees suffered injuries including but not limited to burns and respiratory system irritation after in-process catalyst was released as employees loosened fittings.  c.) United Refining Company, located at 15 Bradley Street, Warren PA, FCC Unit: On or about 3/5/24 and times prior thereto, the employer failed to develop safe work practices for hazard evaluation, selection and use of personal protective equipment in the Line Breaking Procedure prior to a line breaking event for an attempted repair to the FCC Regenerator Standpipe.  Employees suffered injuries including but not limited to burns and respiratory system irritation after in-process catalyst was released as employees loosened fittings. PPE including but not limited to respiratory protection, FR gloves, and face shields were not utilized by the employees involved in the repair  d) United Refining Company, located at 15 Bradley Street, Warren PA, FCC Unit: On or about 3/5/24 and times prior thereto, the employer failed to develop safe work practices for hazard evaluation, selection and use of personal protective equipment in the Fry Panning Procedure.  Prior to installing fry pan for an attempted repair to the FCC Regenerator Standpipe, employees suffered injuries including but not limited to burns and respiratory system irritation after in-process catalyst was released as employees loosened fittings.  PPE including but not limited to respiratory protection, FR gloves, and face shields were not utilized by the employees involved in the repair.    ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $7404.6
  • — Z (S) $10578

1910.147 D02

Serious Gravity 5 1 instance 34 exposed
Issued
Sep 5, 2024
Abate by
Dec 6, 2024
Penalty
Initial $0 · Current $0
29 CFR 1910.147(d)(2): The machine or equipment was not turned off or shut down using the procedures established for the machine or equipment:  a) United Refining Company, located at 15 Bradley Street, Warren PA, FCC Unit, On or about 3/5/24: the employer failed to deenergize the equipment associated with the FCC Regenerated Standpipe and Everlast valve in accordance with procedure Lockout/Tagout (Control of Hazardous Energy Sources) Section 4.O Energy Isolation Procedure and 5.0 Blinding, prior to attempting to repair a leak at the Everlast valve. Employees suffered injuries including but not limited to burns and respiratory system irritation after in-process catalyst was released as employees loosened fittings.    ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.132 A

Serious Gravity 5 1 instance 34 exposed
Issued
Sep 5, 2024
Abate by
Dec 6, 2024
Penalty
Initial $0 · Current $0
29 CFR 1910.132(a): Protective equipment was not used when necessary whenever hazards capable of causing injury and impairment were encountered:  a) United Refining Company, located at 15 Bradley Street, Warren PA, FCC Unit: On or about 3/5/24 and times prior thereto, the employer failed to ensure the use of necessary personal protective equipment during an attempted leak repair in the FCC unit. Employees suffered injuries including but not limited to burns and respiratory system irritation after in-process catalyst was released as employees loosened fittings. PPE including but not limited to respiratory protection, FR gloves and face shields were not utilized by the employees involved in the repair.    ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View United Refining Company's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347473035.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.