Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: BERGLUND CONSTRUCTION COMPANY

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of BERGLUND CONSTRUCTION COMPANY in 901 NORTH 9TH STREET, MILWAUKEE, WI 53203 (NAICS 238140). OSHA activity number 347810657.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Berglund Construction Company — free Get an email when a new federal OSHA severe-injury report for Berglund Construction Company is published. One employer, no account, unsubscribe in one click.
Site address
901 NORTH 9TH STREET
City
MILWAUKEE
State
WI
ZIP
53203
Mailing
8410 S. SOUTH CHICAGO AVE., CHICAGO, IL 60617
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Last modified
Data loaded
NAICS code
238140
Employees
300
Ownership type
A

9 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 6 instances 6 exposed
Issued
Mar 21, 2025
Abate by
Mar 27, 2025
Penalty
Initial $14,895 · Current $14,895
OSH ACT of 1970 Section (5)(a)(1): The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to hazards associated with scaffold collapse due to failure of the scaffold components:  (a) On or about October 10, 2024, and at times prior, at 901 North 9th Street, Milwaukee, WI 53203, employees were exposed to crushing, struck-by, and fall hazards while performing work from an elevated 2-point suspension scaffold swing stage equipped with OZ Lifting Product 1-ton gear trolleys Model: #0Z1GBT.  The trolleys that were connected to the I-beams and the scaffold platform were not designed to be used as personnel lifting devices.
Recent events (2)
  • — C (S) $14895
  • — Z (S) $14895

1926.451 D02

Serious Gravity 5 6 instances 6 exposed
Issued
Mar 21, 2025
Abate by
Apr 16, 2025
Penalty
Initial $10,641 · Current $10,641
29 CFR  1926.451(d)(2): Suspension scaffold outrigger beams were not restrained to prevent movement:  (a) On or about October 10, 2024, and at times prior, at 901 North 9th Street, Milwaukee, WI 53203, the employer had not set up the suspension scaffold outrigger beam to prevent movement, in that the Skyclimber 5" by 5" I-beam were not crossed braced to the Safeway scaffold below to prevent rotation of the I-beams.
Recent events (2)
  • — C (S) $10641
  • — Z (S) $10641

1926.451 D03 IX

Serious Gravity 10 6 instances 6 exposed
Issued
Mar 21, 2025
Abate by
Apr 16, 2025
Penalty
Initial $14,895 · Current $14,895
29 CFR  1926.451(d)(3)(ix): Tiebacks were not secured to a structurally sound anchorage on the building or structure:  (a) On or about October 10, 2024, and at times prior, at 901 North 9th Street, Milwaukee, WI 53203, the employer had not secured the tiebacks of the suspension scaffold system to a structurally sound anchorage on the building.  The tiebacks were secured to a single steel cable that was wrapped around the parapet wall on the north side of the building. The parapet wall was not evaluated to determine if it would support the load of the suspension scaffold, personnel and materials loaded on the scaffold during work activities.
Recent events (2)
  • — C (S) $14895
  • — Z (S) $14895

1926.451 G03 IV

Serious Gravity 10 2 instances 6 exposed
Issued
Mar 21, 2025
Abate by
Apr 16, 2025
Penalty
Initial $0 · Current $0
29 CFR  1926.451(g)(3)(iv): Vertical lifelines, independent support lines, and suspension ropes shall not be attached to each other, nor shall they be attached to or use the same point of anchorage, nor shall they be attached to the same point on the scaffold or personal fall arrest system.  (a) On or about October 10, 2024, and at times prior, at 901 North 9th Street, Milwaukee, WI 53203, the employer had not verified that each vertical lifeline were independent of one another and/or attached at the same anchorage point, in-that the lifelines were secured to a single steel cable that wrapped around the parapet wall on the north side of the building.   (b) On or about October 10, 2024, and at times prior, at 901 North 9th Street, Milwaukee, WI 53203, the employer had not verified the vertical lifelines were independent of the scaffold system in that the steel cable that held the lifelines and the steel cable that held the tiebacks were connected with a Crosby 3/4" D-ring shackle.
Recent events (2)
  • — C (S) $0
  • — Z (S) $0

1926.451 D03 VII

Serious Gravity 10 6 instances 6 exposed
Issued
Mar 21, 2025
Abate by
Apr 16, 2025
Penalty
Initial $14,895 · Current $14,895
29 CFR  1926.451(d)(3)(vii): Tiebacks were not equivalent in strength to the suspension ropes:  (a) On or about October 10, 2024, and at times prior, at 901 North 9th Street, Milwaukee, WI 53203, the tiebacks in the suspended scaffolding system were not equivalent in strength to the suspension ropes, in-that the 12 tiebacks were connected to a single steel cable. The steel cable was wrapped around the parapet wall on the north side of the building and was rated for 30,000 lbs.  The steel cable line is connected with a Crosby 3/4" D-ring shackle which derated the line to 14,000 lbs., exposing employees to a  scaffold collapse and fall hazard.
Recent events (2)
  • — C (S) $14895
  • — Z (S) $14895

1926.451 F07

Serious Gravity 10 6 instances 6 exposed
Issued
Mar 21, 2025
Abate by
Apr 16, 2025
Penalty
Initial $14,895 · Current $14,895
29 CFR  1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person.  (a) On or about October 10, 2024, and at times prior, at 901 North 9th Street, Milwaukee, WI 53203, the suspended scaffold system was not erected by a competent person qualified in scaffold erection.
Recent events (2)
  • — C (S) $14895
  • — Z (S) $14895

1926.454 A

Serious Gravity 10 1 instance 6 exposed
Issued
Mar 21, 2025
Abate by
Apr 16, 2025
Penalty
Initial $0 · Current $0
29 CFR  1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards.   (a) On or about October 10, 2024, and at times prior, at 901 North 9th Street, Milwaukee, WI 53203, the employer had not trained each employee by a qualified person to recognize the hazards associated with the suspension scaffold being used and to understand the procedures to control or minimize those hazards
Recent events (2)
  • — C (S) $0
  • — Z (S) $0

1926.454 B

Serious Gravity 10 6 instances 6 exposed
Issued
Mar 21, 2025
Abate by
Apr 16, 2025
Penalty
Initial $0 · Current $0
29 CFR  1926.454(b): The employer did not have each employee involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question.  (a) On or about October 10, 2024, and at times prior, at 901 North 9th Street, Milwaukee, WI 53203, the employer had not trained employees by a competent person to operate the OZ Lifting product 1-ton gear trolley (Model: #0Z1GBT) prior to the use of the trolley system on the suspended scaffolding.
Recent events (2)
  • — C (S) $0
  • — Z (S) $0

1926.451 G03 I

Serious Gravity 10 2 instances 6 exposed
Issued
Mar 21, 2025
Abate by
Apr 16, 2025
Penalty
Initial $14,895 · Current $14,895
29 CFR  1926.451(g)(3)(i): Vertical lifelines were not fastened to a fixed safe point of anchorage, independent of the scaffold, and protected from sharp edges and abrasion.  (a) On or about October 10, 2024, and at times prior, at 901 North 9th Street, Milwaukee, WI 53203, the employer had not secured the vertical lifelines to a fixed safe point in that the lifelines were secured to a single steel cable anchor point that was wrapped around the parapet wall on the north side of the building. Additionally, the suspension scaffold was also tied back to the same steel cable the vertical life lines were connected to.    (b) On or about October 10, 2024, and at times prior, at 901 North 9th Street, Milwaukee, WI 53203, the employer had not verified the vertical lifelines were independent of the scaffold system in that the steel cable that held the lifelines and the steel cable that held the tiebacks were connected by a Crosby 3/4" D-ring shackle.
Recent events (2)
  • — C (S) $14895
  • — Z (S) $14895

View Berglund Construction Company's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347810657.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.