Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: DURA-BOND PIPE, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of DURA-BOND PIPE, LLC in 2716 SOUTH FRONT STREET, STEELTON, PA 17113 (NAICS 332812). OSHA activity number 347893885.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Dura-Bond Pipe, LLC — free Get an email when a new federal OSHA severe-injury report for Dura-Bond Pipe, LLC is published. One employer, no account, unsubscribe in one click.
Establishment
DURA-BOND PIPE, LLC
Site address
2716 SOUTH FRONT STREET
City
STEELTON
State
PA
ZIP
17113
Mailing
2176 SOUTH FRONT STREET, STEELTON, PA 17113
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332812
Employees
200
Ownership type
A

1 citation on file for this inspection.

1910.147 D03

Other-than-serious Gravity 5 1 instance 1 exposed
Issued
Mar 17, 2025
Abate by
May 15, 2025
Penalty
Initial $8,038 · Current $5,500 Reduced
29 CFR 1910.147(d)(3): All energy isolating devices that were needed to control the energy to the machine or equipment were not physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s).   a) 2176 South Front Street STEELTON, PA 17113 - an employee was conducting a tool adjustment/change on the Birdsboro End Edge Planner without controlling potently hazardous energy of the machine's tool carriage, on or about November 21, 2024.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $5500
  • — Z (S) $8038

View Dura-Bond Pipe, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347893885.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.