DUBOIS, PA ·
OSHA Inspection: GASBARRE PRODUCTS, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of GASBARRE PRODUCTS, INC. in 590 DIVISION STREET, DUBOIS, PA 15801 (NAICS 333513). OSHA activity number 311879191.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- GASBARRE PRODUCTS, INC.
- Site address
- 590 DIVISION STREET
- City
- DUBOIS
- State
- PA
- ZIP
- 15801
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (N)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 333513
- SIC code (legacy)
- 3542
- Employees
- 68
- Ownership type
- Private (A)
- Industry flags
- Manufacturing safety.
Citations
19 citations on file for this inspection.
5(a)(1)
- Issued
- Dec 8, 2010
- Abate by
- Jan 3, 2011
- Penalty
- Initial $3,500 · Current $2,000 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to crane and hoist components that had not been incorporated into a frequent inspection program: a) Gasbarre Products, Inc. - On or about 10/14/10, frequent inspections (i.e. daily to weekly to monthly inspections) were not being performed on the components associated with the cranes and hoists. Only annual inspections were performed by an outside contractor. These cranes/hoists were located in areas that included but were not limited to A-Bay, B-Bay, C- Bay, D-Bay, and E-Bay. ABATEMENT NOTE: Among other methods, feasible and acceptable means to correct the condition include but are not limited to: Per ANSI B30.16 and ANSI B30.11 Frequent Inspections are conducted on a daily to weekly to monthly intervals depending on the use of the equipment as follows: Normal service - monthly Heavy service - weekly to monthly Severe service - daily to weekly Develop a frequent inspection schedule based on the manufacturers manuals, service conditions, and the requirements noted in ASME B30.16 - Hoists, ASME B30.11 - Monorail and Underhung, and ASME B30.10 - Hooks A Qualified Person Shall Determine Whether Conditions Found During The Inspection Constitute A Hazard And Require A More Detailed Inspection. Adjustments, Repairs, Or Replacements Shall Be Made, As Necessary, In Accordance With ASME B30.11, ASME B30.16, Manufacturers Manual Deficiencies Discovered During This Inspection Shall Be Reported Immediately To The Supervisor Or A Designated Person. At a Minimum Frequent Inspections Must Include a Review of: -Operating Mechanisms For Proper Operation, Proper Adjustment, And Unusual Sounds; Such As, But not Limited To, Squeaking, Grinding, Grating, Etc. -Hoist Upper Limit Device Of Electric- Or Air Powered Hoists, Without A Load On The Hook At The Beginning Of Each Shift. Care Shall Be Exercised. The Load Block shall Be Inched Into Its Limit Device Or Run In At Slow Speed On Multi-Speed Or Variable-Speed Hoists. -Hoist Braking System For Proper Operation. -Tanks, Valves, Pumps, Lines, And Other Parts Of air Or Hydraulic Systems ForLeakage -Hooks And Latches, In Accordance With Asme B30.10 -Hook Attachment And Securing Means -Warning Device(S) For Proper Operation -Chain Or Wire Rope In Accordance With Asme B30.16 -Hoist Load Chain In Accordance With Para. 16-2.5.1 Or 16-2.6.1. -Rope Or Load Chain Reeving For Compliance With Recommendations Of The Hoist Manufacturer. -Placement Of End Stops ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED: Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of the abatement. Abatement documentation shall include documents demonstration that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- · I (S) $2000.00
- · Z (S) $3500.00
5(a)(1)
- Issued
- Dec 8, 2010
- Abate by
- Jan 3, 2011
- Penalty
- Initial $2,800 · Current $1,820 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to crane/hoist control pendants that had not been marked as to the intended use of each button: a) Gasbarre Products, Inc. --- Cranes and Hoists --- On or about 10/14/10, pendant control boxes were not marked to indicate the function of the control buttons. The pendants for these cranes/hoists were located in areas that included but were not limited to A-Bay, B-Bay, C-Bay, D-Bay, and E-Bay. ABATEMENT NOTE: Among other methods, feasible and acceptable means to correct the condition include but are not limited to: 1) Complying with the applicable requirements noted in ASME B30.11 Monorails and Underhung Cranes and/or ASME B30.16 - Hoists 2) Replace missing or illegible function labels on pendant control stations. 3) Label markings should be standardized throughout the facility and/or work area per ASME B30.11 and ASME B30.16. ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED: Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of the abatement. Abatement documentation shall include documents demonstration that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- · I (S) $1820.00
- · Z (S) $2800.00
1910.23 E01
- Issued
- Dec 8, 2010
- Abate by
- Jan 3, 2011
- Penalty
- Initial $2,800 · Current $1,820 Reduced
Recent events (2)
- · I (S) $1820.00
- · Z (S) $2800.00
1910.147 C01
- Issued
- Dec 8, 2010
- Abate by
- Feb 3, 2011
- Penalty
- Initial $4,900 · Current $3,185 Reduced
Recent events (2)
- · I (S) $3185.00
- · Z (S) $4900.00
1910.333 A
- Issued
- Dec 8, 2010
- Abate by
- Feb 3, 2011
Recent events (2)
- · I (S)
- · Z (S)
1910.332 B01
- Issued
- Dec 8, 2010
- Abate by
- Feb 3, 2011
Recent events (2)
- · I (S)
- · Z (S)
1910.178 A04
- Issued
- Dec 8, 2010
- Abate by
- Jan 3, 2011
- Penalty
- Initial $3,500 · Current $2,260 Reduced
Recent events (2)
- · I (S) $2260.00
- · Z (S) $3500.00
1910.178 A05
- Issued
- Dec 8, 2010
- Abate by
- Jan 3, 2011
1910.178 L
- Issued
- Dec 8, 2010
- Abate by
- Jan 3, 2011
- Penalty
- Initial $3,500 · Current $2,275 Reduced
Recent events (2)
- · I (S) $2275.00
- · Z (S) $3500.00
1910.178 L04 III
- Issued
- Dec 8, 2010
- Abate by
- Jan 3, 2011
1910.178 L06
- Issued
- Dec 8, 2010
- Abate by
- Jan 3, 2011
1910.184 D
- Issued
- Dec 8, 2010
- Abate by
- Jan 3, 2011
- Penalty
- Initial $2,800 · Current $1,820 Reduced
Recent events (2)
- · I (S) $1820.00
- · Z (S) $2800.00
1910.184 E01
- Issued
- Dec 8, 2010
- Abate by
- Jan 3, 2011
1910.184 E03 I
- Issued
- Dec 8, 2010
- Abate by
- Jan 3, 2011
1910.303 B02
- Issued
- Dec 8, 2010
- Abate by
- Jan 3, 2011
- Penalty
- Initial $2,100
Recent events (2)
- · I (O)
- · Z (S) $2100.00
1910.303 G01
- Issued
- Dec 8, 2010
- Abate by
- Jan 3, 2011
Recent events (2)
- · I (O)
- · Z (S)
1910.242 B
- Issued
- Dec 8, 2010
- Abate by
- Jan 3, 2011
- Penalty
- Initial $2,800
Recent events (2)
- · I (O)
- · Z (S) $2800.00
1910.254 D09 III
- Issued
- Dec 8, 2010
- Abate by
- Jan 3, 2011
- Penalty
- Initial $2,800 · Current $1,820 Reduced
Recent events (2)
- · I (S) $1820.00
- · Z (S) $2800.00
1910.22 D01
- Issued
- Dec 8, 2010
- Abate by
- Jan 3, 2011
More inspections at Gasbarre Products, INC.
View Gasbarre Products, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 333513)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 311879191.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.