OSHA Inspection: MOMENTIVE PERFORMANCE MATERIALS

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of MOMENTIVE PERFORMANCE MATERIALS in 260 HUDSON RIVER ROAD, WATERFORD, NY 12188 (NAICS 325211). OSHA activity number 313758542.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Momentive Performance Materials — free Get an email when a new federal OSHA severe-injury report for Momentive Performance Materials is published. One employer, no account, unsubscribe in one click.
Site address
260 HUDSON RIVER ROAD
City
WATERFORD
State
NY
ZIP
12188
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Y
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
325211
SIC code (legacy)
2821
Employees
1000
Ownership type
A

8 citations on file for this inspection.

1910.119 D03 II

Other-than-serious Gravity 10 1 instance 20 exposed
Issued
Oct 18, 2010
Abate by
May 15, 2011
Penalty
Initial $4,500 · Current $7,000
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that employees
were exposed to inhalation and burn hazards resulting from an uncontrolled
release of sulfuric
acid:
(a)MeCl Process, Railcar Station no. 1, on or about 4/25/10:  Sulfuric
acid transfer
hose assembly was not adequately designed, installed, and maintained to
protect
employees from an uncontrolled release of sulfuric acid.
Abatement note:  Among other methods, one feasible means of abatement for
this hazard
would be the installation of a remote-operated valve (ROV) or similar
device, located at
the transfer hose connection to the railcar.
Pursuant to 29 CFR 1903.19(d), the employer must provide documentation and
certification to OSHA that this violation has been abated within 10
calendar days of
the "Date by which Violation Must be Abated".
Recent events (2)
  • — F (O) $7000.00
  • — Z (S) $4500.00

1910.119 D03 II

Deleted Serious Gravity 10 4 instances 22 exposed
Issued
Oct 18, 2010
Abate by
Nov 22, 2010
Penalty
Initial $4,500 · Current $4,500
29 CFR 1910.119(d)(3)(ii):  The employer did not document that the
equipment in the process
complied with recognized and generally accepted good engineering practices:
(a)MeCl Process, Train A, Building 34A:  Employer failed to document that
relief
systems complied with recommended and generally accepted good engineering
practice(s), such as API 520 Part II, including, but not limited to:
PSV-5205,
PSV-5241, PSV-5245, and PSV-5253, when the inlet pressure drop exceeded 3%
of the set point, on or about 5/25/10.
(a)MeCl Process, Train A, Building 34A: Employer failed to document that
relief
systems complied with recommended and generally accepted good engineering
practice(s), such as API 520 Part I, including, but not limited to:
PSV-5205,
when the outlet pressure drop exceeded 10% of the set point, on or about
5/25/10.
Abatement note:  The employer should document that all relief systems in
the MeCl unit
are properly verifed for compliance with API 520 part I and II.
Pursuant to 29 CFR 1903.19(d), the employer must provide documentation and
certification to OSHA that this violation has been abated within 10
calendar days of
the "Date by which Violation Must be Abated".
Recent events (2)
  • — F (S) $4500.00
  • — Z (S) $4500.00

1910.119 E03 V

Deleted Serious Gravity 10 1 instance 22 exposed
Issued
Oct 18, 2010
Abate by
Nov 22, 2010
Penalty
Initial $4,500 · Current $4,500
29 CFR 1910.119(e)(3)(v):  The process hazard analysis did not address
facility siting:
(a)MeCl process, Trains A & B, on or prior to 6/10/10:  The PHA did not
address
facility siting hazards which could result in personnel exposure to MeCl
vapor in
the process area, including, but not limited to:
-Hazards associated with location of safety relief valve atmospheric vents
immediately adjacent to personnel work platforms on 7th deck;
-Hazards associated with installation of a wind protection barrier which
partially enclosed the structure on the A train side;
-Hazards associated with lack or limitations of vapor detectors/alarms or
other suitable means of warning employees of a vapor leak or release;
-Hazards associated with location of emergency escape respirators.
Pursuant to 29 CFR 1903.19(d), the employer must provide documentation and
certification to OSHA that this violation has been abated within 10
calendar days of
the "Date by which Violation Must be Abated".
Recent events (2)
  • — F (S) $4500.00
  • — Z (S) $4500.00

1910.119 E03 VI

Deleted Serious Gravity 10 3 instances 22 exposed
Issued
Oct 18, 2010
Abate by
Nov 22, 2010
Penalty
Initial $4,500 · Current $4,500
29 CFR 1910.119(e)(3)(vi):  The process hazard analysis did not address
human factors:
(a)MeCl process, Trains A & B:  The Process Hazard Analysis did not address
hazard(s) associated with limited staffing in the control room while
operators are
performing a rail car switch, on or about 5/7/10.
(b)MeCl process, Trains A & B:  The Process Hazard Analysis did not address
hazard(s) associated with operator fatigue and shift length, on or about
5/7/10.
(c)MeCl process, Trains A & B:  The Process Hazard Analysis did not
address shift
staffing and operator failure to follow the established shift change
procedure for
the MeCl/Siloxanes unit, on or about 5/7/10.
Pursuant to 29 CFR 1903.19(d), the employer must provide documentation and
certification to OSHA that this violation has been abated within 10
calendar days of
the "Date by which Violation Must be Abated".
Recent events (2)
  • — F (S) $4500.00
  • — Z (S) $4500.00

1910.119 E05

Deleted Serious Gravity 10 1 instance 22 exposed
Issued
Oct 18, 2010
Abate by
Nov 22, 2010
Penalty
Initial $4,500 · Current $4,500
29 CFR 1910.119(e)(5):  Them employer did not assure that actions
recommended by the
process hazard analysis team are resolved in a timely manner and that the
resolution is
documented:
(a)MeCl Process, Trains A & B:  Employer failed to ensure that all
recommendations from the previous process hazard analysis were completed as
soon as possible, in that PHA recommendations from 2004 study were still
open,
on or prior to 5/7/10.
(b)MeCl Process, Trains A & B:  Employer failed to document the resolution
of all
PHA recommendations from 2004 PHA study, in that the resolution of
recommendation no. 8 "consider installation of a flame arrestor at MeOH
high
point vent" was not documented, on or prior to 6/5/10.
Pursuant to 29 CFR 1903.19(d), the employer must provide documentation
and certification to OSHA that this violation has been abated within 10
calendar days of the "Date by which Violation Must be Abated".
Recent events (2)
  • — F (S) $4500.00
  • — Z (S) $4500.00

1910.119 F03

Serious Gravity 10 7 instances 22 exposed
Issued
Oct 18, 2010
Abate by
Nov 22, 2010
Penalty
Initial $4,500 · Current $7,000
29 CFR 1910.119(f)(3):  The operating procedures were not reviewed as
often as necessary to
assure that they reflect current operating practice, including changes
that result from changes in
process chemicals, technology, and equipment, or changes to facilities:
(a)MeCl Process, A train:  Employer failed to ensure that operating
procedures were
reviewed as often as necessary to ensure that they reflect current
operating
practice, including but not limited to: Chem-Ops East Plant Operating
Manual,
section 4.3.3.2, Critical Alarms, where documentation of high and low
alarms did
not reflect current alarm high and low set points for the following
selected
instruments: PIC-5149, LIC-5064, PT-5142, PT-5112, PT-5107, FFC-5010, and
FIC-5013, on or about 6/10/10.
Pursuant to 29 CFR 1903.19(d), the employer must provide documentation
and certification to OSHA that this violation has been abated within 10
calendar days of the "Date by which Violation Must be Abated".
Recent events (2)
  • — F (S) $7000.00
  • — Z (S) $4500.00

1910.119 J06 II

Other-than-serious Gravity 10 5 instances 22 exposed
Issued
Oct 18, 2010
Abate by
Nov 22, 2010
Penalty
Initial $4,500 · Current $7,000
29 CFR 1910.119(j)(6)(ii):  Appropriate checks and inspections were not
performed to assure
that equipment was installed properly and consistent with design
specifications and the
manufacturer's instructions:
(a)MeCl Process, Train B:  Employer failed to ensure that appropriate
checks and
inspections were performed, in that: short bolts were found on three manway
covers on vessel 340042 (methanol recovery column B2), on or about 6/9/10.
(b)MeCl Process, Train A:  Employer failed to ensure that appropriate
checks
and
inspections were performed in that  Pump inspection work orders were not
reviewed/completed by supervisor, in some cases months after the work order
was completed, for process pumps including, but not limited to: TSW-340438,
TSW-341030, TSW-341021, and TSW-341025, on or prior to  5/18/10.
Pursuant to 29 CFR 1903.19(d), the employer must provide documentation
and certification to OSHA that this violation has been abated within 10
calendar days of the "Date by which Violation Must be Abated".
Recent events (2)
  • — F (O) $7000.00
  • — Z (S) $4500.00

1910.119 J06 III

Other-than-serious Gravity 10 3 instances 22 exposed
Issued
Oct 18, 2010
Abate by
Oct 21, 2010
Penalty
Initial $4,500
29 CFR 1910.119(j)(6)(iii):  The employer did not assure that maintenance
materials, spare parts
and equipment were suitable for the process application for which they
were used:
(a)MeCl Process:  Employer did not ensure that maintenance materials,
spare parts,
and equipment were suitable for the process application for which they
were used,
including, but not limited to: Teflon manway cover gasket(s) and bolts on
vessel
340042 (methanol recovery column B2), on or about 6/09/10.
Recent events (2)
  • — F (O)
  • — Z (S) $4500.00

View Momentive Performance Materials's full OSHA safety record →