SCHAUMBURG, IL ·
OSHA Inspection: GONNELLA FROZEN PRODUCTS, LLC.
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of GONNELLA FROZEN PRODUCTS, LLC. in 1117 WILEY RD, SCHAUMBURG, IL 60173 (NAICS 311999). OSHA activity number 331915124.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- GONNELLA FROZEN PRODUCTS, LLC.
- Site address
- 1117 WILEY RD
- City
- SCHAUMBURG
- State
- IL
- ZIP
- 60173
- Mailing
- 1117 WILEY RD, SCHAUMBURG, IL 60173
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- Union (A)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 311999
- Employees
- 120
- Ownership type
- Private (A)
Citations
17 citations on file for this inspection.
1910.119 E03 I
- Issued
- Aug 10, 2012
- Abate by
- Nov 6, 2012
- Penalty
- Initial $5,000 · Current $3,000 Reduced
0170
General-duty citation text
29 CFR 1910.119(e)(3)(i): The process hazard analysis did not address the hazards of the process: a) Gonnella Frozen Food LLC. - The employers process hazards analysis did not address hazards of its ammonia refrigeration process that were not controlled as prescribed by the ANSI/ASHRAE (American Society of Heating, Refrigerating and Air Conditioning Engineers) Standard 15 - Safety Standard for Refrigeration Systems and IIAR (International Institute of Ammonia Refrigeration) Bulletin No. 109 - Guidelines for IIAR Minimum Safety Criteria for a Safe Ammonia Refrigeration System, or an equivalent. Such hazards include, but are not limited to: 1) Emergency shutdown procedures including precautions to be observed in the event of a breakdown or leak, were not posted outside the engine room and immediately adjacent to each door. 2) Emergency ventilation fans were on a separate electrical circuit and have a control switch immediately outside the machinery room door.
Recent events (3)
- · F (S) $3000
- · C (S) $5000
- · Z (S) $5000
1910.119 E05
- Issued
- Aug 10, 2012
- Abate by
- Nov 6, 2012
- Penalty
- Initial $5,000 · Current $3,000 Reduced
0170
General-duty citation text
29 CFR 1910.119(e)(5): The employer did not establish a system to assure that the process hazard analysis team's recommendations are resolved in a timely manner and that the resolution is documented: a) Gonnella Frozen Products LLC. - The employer did not establish a system to assure that the process hazard analysis team's recommendations for Management of Change 2011 PHA were resolved in a timely manner and that the resolution is documented, specifically: 1) Recommendation 1: Verify that the Recirculator vessel is rated for -40 F. 2) Recommendation 2: Consider adding soft hot gas to new evaporators. 3) Recommendation 3: Verify that there is a check valve on EV14 and EV15. 4) Recommendation 4: Verify that only one evaporator can manually be put into defrost. 5) Recommendation 5: Verify type of pipe stands be used. 6) Recommendation 6: Verify that the ammonia detectors are tied in to shut down the HVAC units on the roof. 7) Recommendation 7: Evaluate the wind sock location. 8) Recommendation 8: Relocate the wind sock to the west fence. 9) Recommendation 9: Consider adding an ammonia detector on the new recirculator relief header. 10) Recommendation 10: Provide light at the new recirculator on the roof. 11) Recommendation 11: Evaluate the stairs on the roof. 12) Recommendation 12: Consider adding pumpout to Freezer #1 at EV10 and EV12. 13) Recommendation 13: Consider adding tie-in from -25 Recirculated liquid line to 10 -40F suction line. 14) Recommendation 14: Consider Adding pumpout to Freezer # 2 at EV7.
Recent events (3)
- · F (O) $3000
- · C (S) $5000
- · Z (S) $5000
1910.119 H02 I
- Issued
- Aug 10, 2012
- Abate by
- Nov 6, 2012
- Penalty
- Initial $5,000 · Current $0 Reduced
0170
General-duty citation text
29 CFR 1910.119(h)(2)(i): The employer, when selecting a contractor, did not obtain and evaluate information regarding the contract employer's safety performance and programs. a) Gonnella Frozen Products LLC. - The employer did not obtain and evaluate information regarding AMS Mechanical Systems, Inc.'s safety performance and programs.
Recent events (3)
- · F (S) $0
- · C (S) $5000
- · Z (S) $5000
1910.119 J02
- Issued
- Aug 10, 2012
- Abate by
- Nov 6, 2012
- Penalty
- Initial $5,000 · Current $3,000 Reduced
0170
General-duty citation text
29 CFR 1910.119(j)(2): The employer did not establish written procedures to maintain the on-going integrity of process equipment. (a) Gonnella Frozen Products LLC. - The employer did not ensure the Mechanical Integrity (MI) program procedure was developed, such as, but not limited to, insulated vessels and piping. (b) Gonnela Frozen Products LLC. - The employer's Mechanical Integrity (MI) program procedures did not list the inspection frequencies for equipment, such as, but not limited to, the High Stage Compressor # 3 AMS -070-Compessor Serial Number 97253.
Recent events (3)
- · F (O) $3000
- · C (S) $5000
- · Z (S) $5000
1910.119 F01
- Issued
- Aug 10, 2012
- Abate by
- Nov 6, 2012
- Penalty
- Initial $5,000 · Current $0 Reduced
0170
General-duty citation text
29 CFR 1910.119(f)(1): The employer did not develop and implement written operating procedures that provided clear instructions for safety conducting activities in each covered process consistent with the process safety information and which addressed the elements listed in 29 CFR 1910.119(f)(1)(i) through (f)(1)(iv): a) Gonnella Frozen Products LLC. - The employer did not develop standard operating procedures (SOPs), such as, but not limited to, charging and pumping out (purging) the ammonia refrigeration process.
Recent events (3)
- · F (S) $0
- · C (S) $5000
- · Z (S) $5000
1910.119 F01 I A
- Issued
- Aug 10, 2012
- Abate by
- Nov 6, 2012
- Penalty
- Initial $0 · Current $0
0170
General-duty citation text
29 CFR 1910.119(f)(1)(i)(A): The employer's written operating procedures covering the steps for each operating phase did not address initial startup: a) Gonnella Frozen Products LLC. - The employer"s written operating procedures, such as, but not limited to the following equipment, did not address initial startup procedures, such as ensuring pressure tests have been completed, testing electrical connection, motor and control wiring, ensuring valves were in the start-up positions and emergency shutdown equipment works properly. 1) Oil Draining, 2) Compressor B-1, 3) Compressor C-1, 4) Evaporator Condenser EC-1 EC-3 EC-4, 5) Blast Freezer, #3 6) Desuperheater, 7) Pilot Receiver, 8) Holding Freezer #3. 9)-40 F Recirculation Package which included the recirculator vessel, recirculator oil pot, and recirculator pumps.
Recent events (3)
- · F (S) $0
- · C (S) $0
- · Z (S) $0
1910.119 F01 I B
- Issued
- Aug 10, 2012
- Abate by
- Nov 6, 2012
- Penalty
- Initial $0 · Current $0
0170
General-duty citation text
29 CFR 1910.119(f)(1)(i)(B): The employer's written operating procedures covering the steps for each operating phase did not address normal operations: a) Gonnella Frozen Products Inc. - The employeris written operating procedures, such asc but not limited to items listed belowc did not address normal operations of operation, such as pressure (including oil pressure), temperatures, vessel levels and motor amps (under different seasonal designs). 1) Oil Draining, 2) Pilot Receiver, 3) Holding Freezer #3. 4)-40 F Recirculation Package which included the recirculator vessel, recirculator oil pot, and recirculator pumps.
Recent events (3)
- · F (S) $0
- · C (S) $0
- · Z (S) $0
1910.119 F01 I C
- Issued
- Aug 10, 2012
- Abate by
- Nov 6, 2012
- Penalty
- Initial $0 · Current $0
0170
General-duty citation text
29 CFR 1910.119(f)(1)(i)(C): The employer's written operating procedures covering the steps for each operating phase did not address temporary operations: (a) Gonnella Frozen Products LLC - The employer's written operating procedures, such asc but not limited to items listed below, did not address temporary operations for each operating phase. 1) Oil Draining, 2) Pilot Receiver, 3) Holding Freezer #3, 4)-40 F Recirculation Package which included the recirculator vessel, recirculator oil pot, and recirculator pumps.
Recent events (3)
- · F (S) $0
- · C (S) $0
- · Z (S) $0
1910.119 F01 I D
- Issued
- Aug 10, 2012
- Abate by
- Nov 6, 2012
- Penalty
- Initial $0 · Current $0
0170
General-duty citation text
29 CFR 1910.119(f)(1)(i)(D): The employer's written operating procedures covering the steps for each operating phase did not address emergency shutdown including the conditions under which emergency shutdown is required, and the assignment of shutdown responsibility to qualified operators to ensure that emergency shutdown in a safe and timely manner: a) Gonnella Frozen Products LLC. - The employer's written standard operating procedures (SOPs) for its refrigeration process, such as, but not limited to items listed below, did not include the conditions under which emergency shutdown was necessary and the assignment of shutdown responsibility to qualified operators to ensure that emergency shutdown is executed in a safe and timely manner. 1) Oil Draining, 2) Pilot Receiver, 3) Holding Freezer #3. 4)-40 F Recirculation Package which included the recirculator vessel, recirculator oil pot, and recirculator pumps. 5) Desuperheater
Recent events (3)
- · F (S) $0
- · C (S) $0
- · Z (S) $0
1910.119 F01 I E
- Issued
- Aug 10, 2012
- Abate by
- Nov 6, 2012
- Penalty
- Initial $0 · Current $0
0170
General-duty citation text
29 CFR 1910.119(f)(1)(i)(E): The employer's written operating procedures covering the steps for each operating phase did not address emergency operations: a) Gonnella Frozen Products LLC - The employer's written operating procedures, such as, but not limited to items listed below, did not address emergency operations. 1) Oil Draining, 2) Pilot Receiver, 3) Holding Freezer #3. 4) -40 F Recirculation Package which included the recirculator vessel, recirculator oil pot, and recirculator pumps.
Recent events (3)
- · F (S) $0
- · C (S) $0
- · Z (S) $0
1910.119 F01 I G
- Issued
- Aug 10, 2012
- Abate by
- Nov 6, 2012
- Penalty
- Initial $0 · Current $0
0170
General-duty citation text
29 CFR 1910.119(f)(1)(i)(G): The employer's written operating procedures covering the steps for each operating phase did not address startup following a turnaround, or after an emergency shutdown: a) Gonnella Frozen Products LLC - The employer's written operating procedures, such as, but not limited to items listed below, did not address startup following a turnaround, or after an emergency shutdown: 1) Oil Draining, 2) Evaporator Condenser EC-1 EC-3 EC-4, 3) Blast Freezer #1, 4) Desuperheater, 5) Compressor B-1, 6) Compressor C-1,
Recent events (3)
- · F (S) $0
- · C (S) $0
- · Z (S) $0
1910.119 F01 II
- Issued
- Aug 10, 2012
- Abate by
- Nov 6, 2012
- Penalty
- Initial $5,000 · Current $2,500 Reduced
0170
General-duty citation text
29 CFR 1910.119(f)(1)(ii): The employer's written operating procedures did not address the requirements for the operating limits listed in 29 CFR 191.119(f)(1)(ii)(A) and (B): a) Gonnella Frozen Products LLC - The employer's written operating procedures, such as, but not limited to items listed below, did not address operating limits for, and deviation in operation parameters, such as compression suction and discharge pressures and temperatures, crankcase and differential oil pressures, oil levels, noise and vibrations and did not describe steps required to avoid deviations. 1) Oil Draining, 2) Compressor B-1, 3) Compressor C-1, 4) Evaporator Condenser EC-1, EC-3, EC-4, 5) Blast Freezer, #3, 6) Desuperheater, 7) Pilot Receiver, 8) Holding Freezer #3. 9)-40 F Recirculation Package which included the recirculator vessel, recirculator oil pot, and recirculator pumps.
Recent events (3)
- · F (S) $2500
- · C (S) $5000
- · Z (S) $5000
1910.119 F01 III
- Issued
- Aug 10, 2012
- Abate by
- Nov 6, 2012
- Penalty
- Initial $5,000 · Current $0 Reduced
0170
General-duty citation text
29 CFR 1910.119(f)(1)(iii): The employer's written operating procedures did not address the requirements for the safety and health considerations listed in 29 CFR 1910.119(f)(1)(iii)(A) through (f)(1)(iii)(E): a) Gonnella Frozen Products LLC - The employer's written operating procedures, such as, but not limited to, the desuperheater, did not address the requirements for the safety and health considerations listed in 29 CFR 1910.119(f)(1)(iii)(A) through (f)(1)(iii)(E).
Recent events (3)
- · F (S) $0
- · C (S) $5000
- · Z (S) $5000
1910.119 F01 III A
- Issued
- Aug 10, 2012
- Abate by
- Sep 24, 2012
- Penalty
- Initial $0 · Current $2,500
0170
General-duty citation text
29 CFR 1910.119(f)(1)(iii)(A): The employer's written operating procedures covering safety and health considerations did not address the properties of, and hazards presented by the chemicals used in the process: a) Gonnella Frozen Products LLC - The employer did not ensure written operating procedures, such as, but not limited to items listed below, included the safety and health considerations and the properties of, and hazards presented by the chemicals used in the process: 1) Oil Draining, 2) Compressor B-1, 3) Compressor C-1, 4) Evaporator Condenser EC-1 EC-3 EC-4,
Recent events (3)
- · F (S) $2500
- · C (S) $0
- · Z (S) $0
1910.119 F01 III C
- Issued
- Aug 10, 2012
- Abate by
- Sep 24, 2012
- Penalty
- Initial $0 · Current $0
0170
General-duty citation text
29 CFR 1910.119(f)(1)(iii)(C): The employer's written operating procedures covering safety and health considerations did not address the control measures to be taken if physical contact or airborne exposure occurs: a) Gonnella Frozen Products LLC - The employer's written operating procedures, such as, but not limited to items listed below, did not include procedures for covering safety and health considerations of control measures to be taken if exposure anhydrous ammonia (physical or airborne) occurs. 1) Oil Draining, 2) Compressor B-1, 3) Compressor C-1, 4) Evaporator Condenser EC-1, EC-3, EC-4,
Recent events (3)
- · F (S) $0
- · C (S) $0
- · Z (S) $0
1910.119 F01 III D
- Issued
- Aug 10, 2012
- Abate by
- Nov 6, 2012
- Penalty
- Initial $0 · Current $0
0170
General-duty citation text
29 CFR 1910.119(f)(1)(iii)(D): The employer's written operating procedures covering safety and health considerations did not address the quality control for raw materials and control of hazardous chemical inventory levels: (a ) Gonnella Frozen Products LLC - The employer's written operating procedures, such as, but not limited to items listed below, did not include procedures covering safety and health considerations addressing the quality control for raw material and control of hazardous chemical inventory levels. 1) Oil Draining, 2) Compressor B-1, 3) Compressor C-1, 4) Evaporator Condenser EC-1 EC-3 EC-4, 5) Blast Freezer, #3 6) Desuperheater, 7) Pilot Receiver, 8) Holding Freezer #3. 9)-40 F Recirculation Package which included the recirculator vessel, recirculator oil pot, and recirculator pumps.
Recent events (3)
- · F (S) $0
- · C (S) $0
- · Z (S) $0
1910.119 F01 IV
- Issued
- Aug 10, 2012
- Abate by
- Nov 6, 2012
- Penalty
- Initial $5,000 · Current $0 Reduced
0170
General-duty citation text
29 CFR 1910.119(f)(1)(iv): The employer's written operating procedures did not address requirements for the safety systems and their functions: (a ) Gonnella Frozen Products LLC - The employer did not ensure written operating procedures for Oil Pot Draining and Desuperheater included and addressed requirements for the safety systems and their functions for the computer software logic, interlocks, pressure relief and detection systems and alarms.
Recent events (3)
- · F (S) $0
- · C (S) $5000
- · Z (S) $5000
More inspections at Gonnella Frozen Products, LLC.
View Gonnella Frozen Products, LLC.'s full OSHA safety record →
More inspections in this industry (NAICS 311999)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 331915124.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.