TAMUNING, GU —
OSHA Inspection: PMV-DESIGNERS BUILDERS
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of PMV-DESIGNERS BUILDERS in NEXT TO 124 ALLEGRO APATRMENTS, TAMUNING, GU 96913 (NAICS 236210). OSHA activity number 339070542.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PMV-DESIGNERS BUILDERS
- Site address
- NEXT TO 124 ALLEGRO APATRMENTS
- City
- TAMUNING
- State
- GU
- ZIP
- 96913
- Mailing
- P.O. BOX 9551, TAMUNING, GU 96931
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236210
- Employees
- 9
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.28 A
- Issued
- Sep 12, 2013
- Abate by
- Sep 24, 2013
- Penalty
- Initial $1,200 · Current $1,200
General-duty citation text
29 CFR 1926.28(a): The employer did not require the wearing of appropriate personal protective equipment in all operations where there is an exposure to hazardous conditions. At the project site: On May 13, 2013, employees were not wearing waterproof gloves to avoid cement-related skin problems while working with wet portland cement.
Recent events (1)
- — Z (S) $1200
1926.102 A01
- Issued
- Sep 12, 2013
- Abate by
- Sep 24, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.102(a)(1): Eye and face protective equipment were not used when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents. At the project site: On May 13 and 14, 2013, employees were not wearing eye protection to avoid eye injuries and burns while working with wet portland cement.
Recent events (1)
- — Z (S) $0
1926.51 F
- Issued
- Sep 12, 2013
- Abate by
- Sep 24, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.51(f): Adequate washing facilities were not provided for employees engaged in the application of paints, coating, herbicides, or insecticides, or in other operations where contaminants might have been harmful to the employees: At the project site: On May 13, 2013, employees were not provided with adequate washing facilities to remove portland cement contaminants.
Recent events (1)
- — Z (O) $0
More inspections at Pmv-Designers Builders
View Pmv-Designers Builders's full OSHA safety record →
More inspections in this industry (NAICS 236210)
More inspections in GU
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339070542.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.