GILMAN, CT —
OSHA Inspection: THE GILMAN BROTHERS COMPANY
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of THE GILMAN BROTHERS COMPANY in GILMAN ROAD, GILMAN, CT 06336 (NAICS 326150). OSHA activity number 339093700.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- THE GILMAN BROTHERS COMPANY
- Site address
- GILMAN ROAD
- City
- GILMAN
- State
- CT
- ZIP
- 06336
- Mailing
- P.O BOX 38, GILMAN, CT 06336
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 326150
- Employees
- 70
- Ownership type
- A
Citations
12 citations on file for this inspection.
1910.119 D03 I B
- Issued
- Nov 27, 2013
- Abate by
- Dec 31, 2014
- Penalty
- Initial $5,390 · Current $5,390
General-duty citation text
29 CFR 1910.119(d)(3)(i)(B): The employer's piping and instrument diagrams did not include information that provided specific identification of equipment that is part of the process: A. On or about May 31, 2013, Facility: The employer's piping and instrumentation diagrams did not include information, such as, but not limited to: The set pressure for the pressure relief valves installed on the 18,000-gallon isopentane vessel or the pressure relief valves at the Corken pumps, the maximum allowable working pressure on the isopentane vessel, and documentation of the pressure relief stacks provided.
Recent events (3)
- — F (S) $5390
- — C (S) $5390
- — Z (S) $5390
1910.119 D03 I D
- Issued
- Nov 27, 2013
- Abate by
- Dec 31, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(d)(3)(i)(D): The employer did not include, in the process safety information compilation, the relief system design and the design basis: A. On or about May 31, 2013, Facility: The process safety information maintained by the employer did not include information on the relief system design basis for the two Fisher H282-250 Series Large Internal Spring Relief Valves installed on the isopentane vessel and the two Corken B166 pressure relief valves.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1910.119 D03 I F
- Issued
- Nov 27, 2013
- Abate by
- Dec 31, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(d)(3)(i)(F): Design codes and standards pertaining to the equipment in the process were not compiled before conducting any process safety analysis required by this standard: A. On or about May 31, 2013, Facility: The employer had not documented the design codes employed in designing the pressure relief system for the process using isopentane as a blowing agent.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1910.119 D03 II
- Issued
- Nov 27, 2013
- Abate by
- Dec 31, 2014
- Penalty
- Initial $3,850 · Current $3,850
General-duty citation text
29 CFR 1910.119(d)(3)(ii): The employer did not document that equipment complies with recognized and generally accepted good engineering practices: A. On or about May 31, 2013, Facility: The employer did not comply with a RAGAGEP, such as, but not limited to ASME Boiler and Pressure Vessel Code, Section VIII or API 520, in that: 1. The employer did not document the inlet pressure drop for pressure relief valves used to protect the pressure vessel containing isopentane. 2. The employer did not document the built up back pressure of the pressure relief valves used to protect the pressure vessel containing isopentane.
Recent events (3)
- — F (S) $3850
- — C (S) $3850
- — Z (S) $3850
1910.119 E03 IV
- Issued
- Nov 27, 2013
- Abate by
- Mar 31, 2015
- Penalty
- Initial $5,390 · Current $5,390
General-duty citation text
29 CFR 1910.119(e)(3)(iv): The process hazard analysis did not consider consequences of failure of engineering and administrative controls: A. On or about May 31, 2013, Facility: The process hazard analysis provided by the employer did not take into consideration the consequences of failure of engineering and administrative controls, such as, but not limited to, failure of Drager gas detection system.
Recent events (3)
- — F (S) $5390
- — C (S) $5390
- — Z (S) $5390
1910.119 E03 V
- Issued
- Nov 27, 2013
- Abate by
- Mar 31, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(e)(3)(v): The process hazard analysis did not address facility siting: A. On or about May 31, 2013, Facility: The employer did not consider the effects an overpressure and rupture of the pressure vessel of isopentane would have on the occupied structures on the site.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1910.119 E03 VI
- Issued
- Nov 27, 2013
- Abate by
- Mar 31, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(e)(3)(vi): The process hazard analysis did not address human factors: A. On or about May 31, 2013, Facility: The company's process hazard analysis did not consider the following: 1. Shift changes and the circumstances that could effect processes, such as the maintenance of covered equipment. 2. Employee fatigue, as the employer operates the covered process on a 3-shift schedule.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1910.119 F03
- Issued
- Nov 27, 2013
- Abate by
- Mar 3, 2014
- Penalty
- Initial $3,850 · Current $3,850
General-duty citation text
29 CFR 1910.119(f)(3): The employer did not annually certify that operating procedures were current and accurate: A. On or about May 31, 2013, Facility: The employer had not reviewed written operating procedures annually, including, but not limited to the following: 1. The operating procedure for receiving isopentane, File #PP-740, was dated October 20, 2005 and had not been reviewed annually. 2. The company's Emergency Action Plan, File #PP-887-02, was dated January 19, 2011 and had not been reviewed within the past year. The Emergency Action Plan included emergency shut down procedures for process equipment.
Recent events (3)
- — F (S) $3850
- — C (S) $3850
- — Z (S) $3850
1910.157 C01
- Issued
- Nov 27, 2013
- Penalty
- Initial $3,850 · Current $0 Reduced
General-duty citation text
29 CFR 1910.157(c)(1): Portable fire extinguishers were not mounted, located and identified so that they were readily accessible without subjecting the employees to injuries: A. On or about May 31, 2013, Line 9: Portable fire extinguishers at locations L1, L2, L3 were not mounted. They were located on the floor and were subject to tipping over. There was no portable fire extinguisher present in position L4.
Recent events (3)
- — F (S) $0
- — C (S) $3850
- — Z (S) $3850
1910.157 G02
- Issued
- Nov 27, 2013
- Abate by
- Jan 16, 2014
- Penalty
- Initial $3,850 · Current $0 Reduced
General-duty citation text
29 CFR 1910.157(g)(2): The educational program to familiarize employees with the general principles of fire extinguisher use and the hazards involved with incipient stage fire fighting was not provided to all employees upon initial employment, and at least annually thereafter: A. On or about May 31, 2013, Facility: All employees who were authorized to remain on site after an emergency evacuation to fight incipient stage fires had not been trained annually on proper portable fire extinguisher usage.
Recent events (3)
- — F (S) $0
- — C (S) $3850
- — Z (S) $3850
1910.119 J04 I
- Issued
- Nov 27, 2013
- Abate by
- Dec 31, 2014
- Penalty
- Initial $53,900 · Current $26,796 Reduced
General-duty citation text
29 CFR 1910.119(j)(4)(i): The employer did not perform inspection and tests on process equipment: A. On or about May 31, 2013, Facility: The employer had not performed inspections and tests on process equipment, including, but not limited to: Pressure vessels; piping systems; valves; relief and vent systems and devices; emergency shutdown systems; monitoring devices and sensors; alarms; interlocks; and pumps used in the process where isopentane was used as a blowing agent.
Recent events (3)
- — F (R) $26796
- — C (W) $53900
- — Z (W) $53900
1910.119 J02
- Issued
- Nov 27, 2013
- Abate by
- Dec 31, 2014
- Penalty
- Initial $10,780 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(j)(2): The employer did not establish written procedures to maintain the on-going integrity of process equipment: A. On or about May 31, 2013, Facility: The employer had not developed and implemented specific written procedures to address regular inspections and preventive maintenance to covered processes in accordance with recognized and generally accepted good engineering practices. The procedures would need to cover tanks, pumps, piping and process equipment used for the foam board production line that used isopentane as a blowing agent. The Gilman Brothers Company was previously cited for a violation of this Occupational Safety and Health standard or its equivalent standard (1910.119(j)(2)), which was contained in OSHA inspection number 311759021, Citation Number 1, Item Number 10a and was affirmed as a final order on March 16, 2009, with respect to a workplace located at Gilman Road, Gilman, Connecticut.
Recent events (3)
- — F (R) $0
- — C (R) $10780
- — Z (R) $10780
More inspections at The Gilman Brothers Company
View The Gilman Brothers Company's full OSHA safety record →
More inspections in this industry (NAICS 326150)
More inspections in CT
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339093700.