On , OSHA opened a complaint safety inspection of INTERLAKE MECALUX, INC. in 1600 N. 25TH AVE., MELROSE PARK, IL 60161 (NAICS 332911). OSHA activity number 339430886.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- INTERLAKE MECALUX, INC.
- Site address
- 1600 N. 25TH AVE.
- City
- MELROSE PARK
- State
- IL
- ZIP
- 60161
- Mailing
- 1600 N. 25TH AVE., MELROSE PARK, IL 60161
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332911
- Employees
- 329
- Ownership type
- Private (A)
Citations
19 citations on file for this inspection.
1910.23 C01
- Issued
- Apr 4, 2014
- Abate by
- May 9, 2014
- Penalty
- Initial $6,600 · Current $3,300 Reduced
General-duty citation text
29 CFR 1910.23(c)(1): Open-sided floors and/or platforms four feet or more above adjacent floor or ground level were not guarded with standard railings (or equivalent) and toeboards: Note: Toeboards are only required when persons can pass, there is moving equipment or there is equipment with which falling materials could create a hazard. (a) Production - The employer did not ensure that a pit over 4 feet deep located near USA332 was guarded with a standard railing, which consisted of a top rail, intermediate rail and posts, and had a vertical height of 42 inches nominal from upper surface of top rail to floor. (b) Production - The employer did not ensure that a pit over 6 feet deep located at Slitter 581 near the coil loading zone was guarded with a standard railing, which consisted of a top rail, intermediate rail and posts, and had a vertical height of 42 inches nominal from upper surface of top rail to floor.
Recent events (2)
- · I (S) $3300
- · Z (S) $6600
1910.147 C06 I
- Issued
- Apr 4, 2014
- Abate by
- May 9, 2014
- Penalty
- Initial $7,000 · Current $3,500 Reduced
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: (a) Production/Maintenance - The employer did not conduct annual periodic inspections of the energy control procedures to ensure that procedures and requirements of the standards were being followed.
Recent events (2)
- · I (S) $3500
- · Z (S) $7000
1910.147 C07 I A
- Issued
- Apr 4, 2014
- Abate by
- Apr 16, 2014
- Penalty
- Initial $7,000 · Current $3,500 Reduced
General-duty citation text
29 CFR 1910.147(c)(7)(i)(A): Authorized employee(s) did not receive training in the recognition of applicable hazardous energy sources, the type and magnitude of the energy available in the workplace, and the methods and means necessary for energy isolation; (a) Production - The employer failed to provide training to each authorized employee to ensure they had the knowledge and skills required for the safe application, usage and removal of energy control when performing maintenance or set up on a machine or equipment. On or about October 15, 2013, employees performing set up on Press 311 had not been provided training.
Recent events (2)
- · I (S) $3500
- · Z (S) $7000
1910.147 D04 I
- Issued
- Apr 4, 2014
- Abate by
- Apr 16, 2014
- Penalty
- Initial $7,000 · Current $3,500 Reduced
General-duty citation text
29 CFR 1910.147(d)(4)(i): Lockout or tagout devices were not affixed to each energy isolating device by authorized employees: (a) Production - On or about October 15, 2014, the employer failed to require all employees performing servicing and maintenance on Press 311 to apply lockout/tagout devices to each energy source such as electrical and pneumatic. Employees did not perform lockout tagout when set up was being performed. (b) Production - On or about October 18, 2013, the employer failed to require all employees performing servicing and maintenance to apply lockout/tagout devices to each energy source such as electrical and pneumatic. Employees did not perform lockout tagout when cleaning the ISO FLO HD Panel 315 where live electrical parts were present.
Recent events (2)
- · I (S) $3500
- · Z (S) $7000
1910.212 A01
- Issued
- Apr 4, 2014
- Abate by
- Jun 16, 2014
- Penalty
- Initial $7,000 · Current $7,000
General-duty citation text
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by nip points and rotating parts: (a) Press 311/Press 438/Press 437- The employer failed to ensure that all permanently fenced doors surrounding the mechanical power presses and movable fence doors equipped with wheels located in-front of the mechanical power press were interlocked to prevent access to areas around the press where rotating parts were present. The interlocks on some doors were broken, missing or never installed in several areas of the presses. (b) Slitter 581- The employer failed to ensure that all permanently fenced doors were equipped with working interlocks, some of the sensors were bent or broken off and some of the fenced doors were not equipped with interlocks at all. Stairs leading to the platform where slitter knives are present were not guarded to prevent employees from accessing the area. (c) USA 332 - The employer failed to ensure that permanently fenced doors extended to all areas that would allow employee access where ingoing nip points and rotating parts were present. Some interlocks equipped on permanently fenced doors were bent, broken off and some fenced doors were not equipped with interlocks but latches. The fencing equipped did not fully extended to prevent employees from being exposed to rotating and moving parts. (d) USA 149 - The employer failed to ensure that permanently fenced doors were present at all access areas that would allow employees entrance where ingoing nip points were present. Some interlocks equipped on permanently fenced doors were bent, broken off and some doors were not equipped with interlocks at all. Guard fencing did not extended to the area from which the material was ejected. Stairs allowing employee access to the back end of the machine where rotating parts were present was not guarded. A gated door near the coil encasing area was not interlocked allowing employees access into the back of the machine where rotating parts were present. (e) Rollformers - The employer failed to ensure that permanently fenced doors were equipped with working interlocks, to prevent employees from accessing areas where moving parts were present. Some of the interlocks on the machine were broken off or missing.
Recent events (2)
- · I (S) $7000
- · Z (S) $7000
1910.217 C02 III
- Issued
- Apr 4, 2014
- Abate by
- Apr 16, 2014
- Penalty
- Initial $5,500 · Current $2,600 Reduced
General-duty citation text
29 CFR 1910.217(c)(2)(iii): Fixed barrier guard(s) on mechanical power press(es) were not attached securely to the frame of the press or to the bolster plate: (a) Production- The employer did not ensure that the set of swinging gates affixed to the mechanical power press machine #436, were interlocked and the press was equipped with light sensors.
Recent events (2)
- · I (S) $2600
- · Z (S) $5500
1910.217 D09 IV
- Issued
- Apr 4, 2014
- Abate by
- Apr 16, 2014
- Penalty
- Initial $7,000 · Current $3,500 Reduced
General-duty citation text
29 CFR 1910.217(d)(9)(iv): Safety blocks were not used when mechanical power press die(s) were being adjusted or repaired in the press: (a) Production- The employer did not ensure that safety blocks were utilized by employees when set up and adjustment of dies was performed. On or about October 15, 2013, employees were performing set-up on Press 311 and die blocks were not used.
Recent events (2)
- · I (S) $3500
- · Z (S) $7000
1910.217 E01 II
- Issued
- Apr 4, 2014
- Abate by
- May 23, 2014
- Penalty
- Initial $3,300 · Current $1,900 Reduced
General-duty citation text
29 CFR 1910.217(e)(1)(ii): Mechanical power press(es) were not inspected and tested at least weekly to determine the condition of the clutch/brake mechanism, anti-repeat feature and single stroke mechanism. (a) Production - The employer did not ensure that weekly inspections were conducted on mechanical power presses to determine the condition of the clutch/brake mechanism, anti-repeat feature and single stroke mechanism.
Recent events (2)
- · I (S) $1900
- · Z (S) $3300
1910.332 B01
- Issued
- Apr 4, 2014
- Abate by
- May 23, 2014
- Penalty
- Initial $7,000 · Current $3,500 Reduced
General-duty citation text
29 CFR 1910.332(b)(1): Employees were not trained in and familiar with the safety-related work practices required by 1910.331 through 1910.335 that pertained to their respective job assignments: (a) Facility Wide - The employer did not provide training to maintenance employees on safety related work practices that pertained to their respective job assignments.
Recent events (2)
- · I (S) $3500
- · Z (S) $7000
1910.333 A
- Issued
- Apr 4, 2014
- Abate by
- May 23, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.333(a): Safety-related work practices were not employed to prevent electric shock or other injuries resulting from either direct or indirect electrical contacts, when work was performed near or on equipment or circuits which were or could be energized: (a) Facility Wide - The employer did not develop or implement electrical safety related work practices to prevent electric shock or other injuries resulting from either direct or indirect electrical contacts. Employees perform work near or on equipment which could be energized.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1910.334 A02 II
- Issued
- Apr 4, 2014
- Abate by
- Apr 16, 2014
- Penalty
- Initial $3,300 · Current $1,900 Reduced
General-duty citation text
29 CFR 1910.334(a)(2)(ii): There was a defect or evidence of damage that could have exposes an employee to injury and the defective or damaged item was not removed from service: (a) Production - The employer did not ensure that defective or damaged extension cords were removed from service. A defective extension cord that was frayed was used to power a water pump that was used to clean the inside of a pit at Slitter 581.
Recent events (2)
- · I (S) $1900
- · Z (S) $3300
1910.335 A01 I
- Issued
- Apr 4, 2014
- Abate by
- May 2, 2014
- Penalty
- Initial $4,400 · Current $2,500 Reduced
General-duty citation text
29 CFR 1910.335(a)(1)(i): Employees working in areas where there were potential electrical hazards were not provided with electrical protective equipment that was appropriate for the specific parts of the body that needed to be protected and for the work being performed: (a) Facility Wide - The employer did not provide electrical protective equipment such as gloves and FR rated clothing to protect employees from electrical hazards when performing electrical work including live trouble shooting.
Recent events (2)
- · I (S) $2500
- · Z (S) $4400
1910.335 A01 V
- Issued
- Apr 4, 2014
- Abate by
- May 2, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.335(a)(1)(v): Employees exposed to the danger of injury to the eyes or face from electric arcs or flashes or from flying objects resulting from electrical explosion did not wear protective equipment for the eyes or face: (a) Facility Wide - The employer did not provide protective equipment for eyes or face to protect employees from hazards including electric arcs or flashes or from flying objects from electrical explosions when performing electrical work such as live troubleshooting.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1910.22 A02
- Issued
- Apr 4, 2014
- Abate by
- Apr 16, 2014
- Penalty
- Initial $1,100 · Current $550 Reduced
General-duty citation text
29 CFR 1910.22(a)(2): Floor(s) of workroom(s) were not maintained in a clean and, so far as possible, a dry condition: (a) Production - The employer did not ensure that area located in front of the Old Hydro 315 electrical panel were maintained in a dry condition. Water leaking from the roof on to the awning above the electrical panel was accumulating on the floor.
Recent events (2)
- · I (O) $550
- · Z (O) $1100
1910.26 C03 VII
- Issued
- Apr 4, 2014
- Abate by
- May 2, 2014
- Penalty
- Initial $1,100 · Current $550 Reduced
General-duty citation text
29 CFR 1910.26(c)(3)(vii): Portable ladders were used for other uses than that for which they were intended: (a) Slitter 581 - The employer did not ensure that portable ladders were not used for uses other than which they were intended for. A metal A frame ladder was tied against the wall of the pit when pit cleaning was being performed to provided employees access into and out of the pit.
Recent events (2)
- · I (O) $550
- · Z (O) $1100
1910.179 J02 III
- Issued
- Apr 4, 2014
- Abate by
- Apr 16, 2014
- Penalty
- Initial $1,100 · Current $550 Reduced
General-duty citation text
29 CFR 1910.179(j)(2)(iii): A certification record which includes the date of inspection, the signature of the person who performed the inspection and the serial number, or other identifier, of the hook inspected, was not maintained: (a) Facility Wide - The employer did not ensure that records of crane inspections which included the date of the inspection, the signature of the person who performed the inspection and the serial number of the hooks inspected throughout the facility were maintained.
Recent events (2)
- · I (O) $550
- · Z (O) $1100
1910.179 L01
- Issued
- Apr 4, 2014
- Abate by
- Apr 30, 2014
- Penalty
- Initial $1,100 · Current $550 Reduced
General-duty citation text
29 CFR 1910.179(l)(1): Preventive maintenance. A preventive maintenance program based on the crane manufacturer's recommendations shall be established. (a) Facility Wide - The employer did not establish a written preventative maintenance program for all the overhead cranes.
Recent events (2)
- · I (O) $550
- · Z (O) $1100
1910.179 M01
- Issued
- Apr 4, 2014
- Abate by
- Apr 16, 2014
- Penalty
- Initial $1,100 · Current $550 Reduced
General-duty citation text
29 CFR 1910.179(m)(1): A certification record which includes the date of inspection, the signature of the person who performed the inspection and an identifier for the ropes which were inspected were not being kept on file where readily available to appointed personnel: (a) Facility Wide - Certification records which included the date of inspection, the signature of the person who performed the inspection and an identifier for the ropes for all cranes were not maintained.
Recent events (2)
- · I (O) $550
- · Z (O) $1100
1910.179 N04 I
- Issued
- Apr 4, 2014
- Abate by
- Apr 16, 2014
- Penalty
- Initial $1,100 · Current $550 Reduced
General-duty citation text
29 CFR 1910.179(n)(4)(i): The upper limit switch of each hoist was not tried out under no load, at the beginning of each operator's shift: (a)Facility Wide - The employer did not ensure that upper limit switches on each crane was tried out under no load at the beginning of each operator's shift.
Recent events (2)
- · I (O) $550
- · Z (O) $1100
More inspections at Interlake Mecalux, INC.
View Interlake Mecalux, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 332911)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339430886.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.