SAIPAN, MP —
OSHA Inspection: NANJING BEILIDA NEW MATERIALS SYSTEM ENGINEERING CO. LTD.
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of NANJING BEILIDA NEW MATERIALS SYSTEM ENGINEERING CO. LTD. in IMPERIAL PACIFIC RESORT CONSTRUCTION PROJECT, SAIPAN, MP 96950 (NAICS 236220). OSHA activity number 341988806.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Site address
- IMPERIAL PACIFIC RESORT CONSTRUCTION PROJECT
- City
- SAIPAN
- State
- MP
- ZIP
- 96950
- Mailing
- NO. 1 SHUANG LONG STREET QINHUAI DISTRICT
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236220
- Employees
- 300
- Ownership type
- A
Citations
6 citations on file for this inspection.
1926.350 A09
- Issued
- May 26, 2017
- Abate by
- Jun 8, 2017
- Penalty
- Initial $5,432 · Current $4,074 Reduced
General-duty citation text
29 CFR 1926.350(a)(9): Compressed gas cylinder(s) were not secured in an upright position: a) On December 16, 2016, on the north side of the facility outside of the main entrance, compressed gas cylinders were not secured in an upright position. Employees were exposed to struck-by hazards. b) On December 16, 2016, on the west side of the facility just inside of the main street entrance, compressed gas cylinders were not secured in an upright position. Employees were exposed to struck-by hazards. c) On December 16, 2016, on the west side of the building on the second floor, compressed gas cylinders were not secured in an upright position. Employees were exposed to struck-by hazards.
Recent events (3)
- — F (S) $4074
- — C (S) $5432
- — Z (S) $5432
1926.350 H
- Issued
- May 26, 2017
- Penalty
- Initial $5,432 · Current $4,074 Reduced
General-duty citation text
29 CFR 1926.350(h): Oxygen, and fuel gas pressure regulators, or their related gauges were not in proper working order while in use: a) On December 16, 2016, on the west side of the building, employees were operating torch cutting equipment with a broken oxygen tank gauge needle. Employees were exposed to struck-by hazards. b) On December 16, 2016, on the north side of the building, employees were operating torch cutting equipment with a broken oxygen tank gauge needle. Employees were exposed to struck-by hazards.
Recent events (3)
- — F (S) $4074
- — C (S) $5432
- — Z (S) $5432
1926.502 D21
- Issued
- May 26, 2017
- Abate by
- Jun 2, 2017
- Penalty
- Initial $9,054 · Current $6,791 Reduced
General-duty citation text
29 CFR 1926.502(d)(21): Personal fall arrest systems were not inspected prior to each use for wear, damage, and other deterioration, and/or defective components were not removed from service: On December 16, 2016, on the north side of the building, an employee working from scaffolding was using a lanyard with damaged snap hooks. Employee was exposed to fall hazards from distances up to 80-feet.
Recent events (3)
- — F (S) $6790.5
- — C (S) $9054
- — Z (S) $9054
1926.1052 A03
- Issued
- May 26, 2017
- Penalty
- Initial $5,432 · Current $4,074 Reduced
General-duty citation text
29 CFR 1926.1052(a)(3): Riser height and/or tread depth was not uniform within each flight of stairs, including any foundation structure used as one or more treads of the stairs: On December 16, 2016, on the West side of the worksite, employees were using a stairway constructed from tubular scaffolding that had varying riser heights greater than 1", exposing employees to a fall hazards.
Recent events (3)
- — F (S) $4074
- — C (S) $5432
- — Z (S) $5432
1926.1424 A02 II
- Issued
- May 26, 2017
- Abate by
- Jun 8, 2017
- Penalty
- Initial $9,054 · Current $6,791 Reduced
General-duty citation text
29 CFR 1926.1424(a)(2)(ii): To prevent employees from entering hazard areas, the employer did not erect and maintain control lines, warning lines, railings or similar barriers to mark the boundaries of the hazard areas and/or did not train each employee to understand what these markings signify: On December 16, 2016, on the north side of the construction site, the employer did not construct or install controls to mark the boundaries of the swing hazard areas of the crane and workers were allowed to walk beneath the crane with a cart of compressed gas cylinders. Employees were exposed to struck-by and caught-between hazards.
Recent events (3)
- — F (S) $6790.5
- — C (S) $9054
- — Z (S) $9054
1904.29 A
- Issued
- May 26, 2017
- Abate by
- Jun 8, 2017
- Penalty
- Initial $1,811 · Current $1,358 Reduced
General-duty citation text
29 CFR 1904.29(a): The employer did not use an OSHA 300, 301 and 300A Form or equivalent. On December 16, 2016, the employer forms used for recording injuries and illnesses were not an equivalent form for the calendar year 2016. The employer's form did not include columns E and G through M of the OSHA Form 300 for recordable injuries.
Recent events (3)
- — F (O) $1358
- — C (O) $1811
- — Z (O) $1811
More inspections at Nanjing Beilida NEW Materials System Engineering CO. LTD.
View Nanjing Beilida NEW Materials System Engineering CO. LTD.'s full OSHA safety record →
More inspections in this industry (NAICS 236220)
More inspections in MP
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341988806.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.