OSHA Inspection: NANJING BEILIDA NEW MATERIALS SYSTEM ENGINEERING CO. LTD.

Unprogrammed Related inspection · Health discipline

On , OSHA opened an unprogrammed Related health inspection of NANJING BEILIDA NEW MATERIALS SYSTEM ENGINEERING CO. LTD. in IMPERIAL PACIFIC RESORT CONSTRUCTION PROJECT, SAIPAN, MP 96950 (NAICS 236220). OSHA activity number 341988814.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Nanjing Beilida NEW Materials System Engineering CO. LTD. — free Get an email when a new federal OSHA severe-injury report for Nanjing Beilida NEW Materials System Engineering CO. LTD. is published. One employer, no account, unsubscribe in one click.
Site address
IMPERIAL PACIFIC RESORT CONSTRUCTION PROJECT
City
SAIPAN
State
MP
ZIP
96950
Mailing
NO. 1 SHUANG LONG STREET QINHUAI DISTRICT
Inspection type
Unprogrammed Related (G)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
300
Ownership type
A

4 citations on file for this inspection.

1926.451 B01

Serious Gravity 5 1 instance 250 exposed
Issued
May 26, 2017
Abate by
Jun 8, 2017
Penalty
Initial $9,054 · Current $9,054
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii):     On December 16, 2016, on the center north face of the construction project, employees were working from tube and coupler scaffolding that was not fully planked. Employees were exposed to fall hazards.
Recent events (3)
  • — F (S) $9054
  • — C (S) $9054
  • — Z (S) $9054

1926.451 E01

Serious Gravity 10 1 instance 250 exposed
Issued
May 26, 2017
Abate by
Jun 8, 2017
Penalty
Initial $12,675 · Current $8,751 Reduced
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used.     On December 16, 2016, on the center north face of the construction project, access ladders or other means of access were not provided for employees working from tube and coupler scaffolding at levels from 10 feet to 80 feet.  Employees were exposed to fall hazards.
Recent events (3)
  • — F (S) $8751
  • — C (S) $12675
  • — Z (S) $12675

1926.451 H02

Serious Gravity 5 1 instance 250 exposed
Issued
May 26, 2017
Abate by
Jun 8, 2017
Penalty
Initial $10,864 · Current $7,395 Reduced
29 CFR 1926.451(h)(2): Employees working below a scaffold were not protected from falling tools, materials or equipment in accordance with the provisions of paragraphs (h)(2)(i)-(v) of this section:    On December 16, 2016, on the center north face of the construction project, employees working underneath and/or around scaffold systems were not protected from struck-by hazards.
Recent events (3)
  • — F (S) $7395
  • — C (S) $10864
  • — Z (S) $10864

1926.452 B02

Serious Gravity 10 1 instance 11 exposed
Issued
May 26, 2017
Abate by
Jun 8, 2017
Penalty
Initial $12,675 · Current $8,751 Reduced
29 CFR 1926.452(b)(2): Transverse bracing forming an "X" across the width of the scaffold was not installed at the scaffold ends and at least at every third set of posts horizontally (measured from only one end) and every fourth runner vertically. Bracing did not extend diagonally from the inner or outer posts or runners upward to the next outer or inner posts or runners:    On December 16, 2016, on the center north face of the construction project, workers were working from tube and coupler scaffolding where the transverse bracing across the width of the scaffold was not installed. Employees were exposed to fall hazards.
Recent events (3)
  • — F (S) $8751
  • — C (S) $12675
  • — Z (S) $12675

View Nanjing Beilida NEW Materials System Engineering CO. LTD.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341988814.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.