Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: WESTAR ROOFING CORPORATION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of WESTAR ROOFING CORPORATION in DEFENSE LOGISTICS AGENCY OPERATIONS CENTER 8000 JEFFERSON DAVIS HIGHWAY, RICHMOND, VA 23297 (NAICS 238160). OSHA activity number 342506946.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Westar Roofing Corporation — free Get an email when a new federal OSHA severe-injury report for Westar Roofing Corporation is published. One employer, no account, unsubscribe in one click.
Site address
DEFENSE LOGISTICS AGENCY OPERATIONS CENTER 8000 JEFFERSON DAVIS HIGHWAY
City
RICHMOND
State
VA
ZIP
23297
Mailing
2516 SQUADRON COURT, VIRGINIA BEACH, VA 23453
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
80
Ownership type
A

1 citation on file for this inspection.

1926.403 B02

Other-than-serious 1 instance 1 exposed
Issued
Jan 2, 2018
Penalty
Initial $0 · Current $0
29 CFR 1926.403(b)(2): Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification:  a) On or about 07-26-2017 and times prior thereto, located at DLA Operations Center, 8000 Jefferson Davis Hwy. Richmond, VA 23297, Condition: Employee(s) were exposed to electrical and fire hazards from a temporary electrical extension cord supplying 110 Volts to a 3-way GFCI pigtail which had a second temporary electrical extension cord that was plugged into it in a "daisy-chained" fashion supplying electrical current to portable hand tools to accomplish roofing "detail work".  A large "Maxx Air Pro" metal fan was also plugged into the 3-way GFCI pigtail that was 'daisy-chained" with the other cords.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employee(s) and their representatives were informed of this abatement.
Recent events (1)
  • — Z (O) $0

View Westar Roofing Corporation's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342506946.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.