NEWARK, NJ —
OSHA Inspection: TROY CHEMICAL CORPORATION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of TROY CHEMICAL CORPORATION in 1 AVENUE L, NEWARK, NJ 07105 (NAICS 325510). OSHA activity number 346808405.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- TROY CHEMICAL CORPORATION
- Site address
- 1 AVENUE L
- City
- NEWARK
- State
- NJ
- ZIP
- 07105
- Mailing
- 1 AVENUE L, NEWARK, NJ 07105
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 325510
- Employees
- 79
- Ownership type
- A
Citations
13 citations on file for this inspection.
1910.119 D03 I B
- Issued
- Jan 10, 2024
- Abate by
- Mar 26, 2024
- Penalty
- Initial $10,046 · Current $5,000 Reduced
General-duty citation text
29 CFR 1910.119(d)(3)(i)(B): The employer's piping and instrument diagrams were not accurate and did not represent equipment that was existing and was part of the process: a) Methanol storage tank T-203 The conservation vents with flame arrestors were missing on P&ID drawing EWR-PID-TF-METH for methanol storage tanks T-203. b) Methanol storage tank T-206 The conservation vents with flame arrestors were missing on P&ID drawing EWR-PID-TF-METH for methanol storage tanks T-206. Violation occurred on or about 11/3/23.
Recent events (3)
- — F (O) $5000
- — C (S) $10046
- — Z (S) $10046
1910.119 D03 I H
- Issued
- Jan 10, 2024
- Abate by
- Mar 26, 2024
- Penalty
- Initial $10,046 · Current $5,000 Reduced
General-duty citation text
29 CFR 1910.119(d)(3)(i)(H): Process safety information pertaining to the equipment in the process did not include the safety systems (e.g., interlocks, detection or suppression systems): a) Methanol storage tank T-203 Process safety information specific to the conservation vents/flame arrestor on T-203 was not documented. A product specification sheet from the manufacturer was provided but this included several models each with their own specification. It was not specific to the conservation vent/flame arrestor in use. b) Methanol storage tank T-206 Process safety information specific to the conservation vents/flame arrestor on T-206 was not documented. A product specification sheet from the manufacturer was provided but this included several models each with their own specification. It was not specific to the conservation vent/flame arrestor in use. Violation occurred on or about 11/3/23.
Recent events (3)
- — F (O) $5000
- — C (S) $10046
- — Z (S) $10046
1910.119 D03 II
- Issued
- Jan 10, 2024
- Abate by
- May 30, 2024
- Penalty
- Initial $10,046 · Current $5,000 Reduced
General-duty citation text
29 CFR 1910.119(d)(3)(ii): The employer did not document that equipment complies with recognized and generally accepted good engineering practices: a) Fractionator column CL-7160 The employer did not document the repair to the fractionator column CL-7160 completed in January 2011 complied with RAGAGEP including but not limited to NBIC 23 part 3 and API 510. The column received an R-Stamp but there is no further documentation related to the repair. Violation occurred on or about 11/9/23.
Recent events (3)
- — F (O) $5000
- — C (S) $10046
- — Z (S) $10046
1910.119 E03 V
- Issued
- Jan 10, 2024
- Abate by
- May 30, 2024
- Penalty
- Initial $14,063 · Current $14,650
General-duty citation text
29 CFR 1910.119(e)(3)(v): The process hazard analysis did not address facility siting: a) Facility The employer did not evaluate the consequences to building 71 and nearby structures including but not limited to tank farm 200, building 35, building 01, and building 101, in their process hazard analysis (PHA) to determine impact and damages from a blast wave and/or ignition flammable vapor clouds. Violation occurred on or around 7/12/2023.
Recent events (3)
- — F (S) $14650
- — C (S) $14063
- — Z (S) $14063
1910.119 F01 III B
- Issued
- Jan 10, 2024
- Abate by
- May 30, 2024
- Penalty
- Initial $10,046 · Current $5,000 Reduced
General-duty citation text
29 CFR 1910.119(f)(1)(iii)(B): The employer's written operating procedures covering safety and health considerations did not address the precautions necessary to prevent exposure, including engineering controls, administrative controls, and personal protective equipment: a) Polyphase Part II & methanol recovery process Operating procedures did not require operators to wear FRC clothing to protect from methanol flash fires during job tasks including, but not limited to methanol unloading and checking for leaks while charging methanol to vessels/tanks. Violation occurred on or about 7/12/23.
Recent events (3)
- — F (O) $5000
- — C (S) $10046
- — Z (S) $10046
1910.132 A
- Issued
- Jan 10, 2024
- Abate by
- May 30, 2024
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.132(a): Protective equipment was not used when necessary whenever hazards capable of causing injury and impairment were encountered: a) Polyphase Part II & methanol recovery process Operators were not required to wear flame resistant clothing to protect from methanol flash fires during job task including but not limited to methanol unloading and checking for leaks while charging methanol to vessels/tanks. Violation occurred on or about 7/12/23.
Recent events (3)
- — F (O) $0
- — C (S) $0
- — Z (S) $0
1910.119 H02 I
- Issued
- Jan 10, 2024
- Abate by
- Mar 26, 2024
- Penalty
- Initial $10,046 · Current $5,000 Reduced
General-duty citation text
29 CFR 1910.119(h)(2)(i): The employer, when selecting a contractor, did not obtain and evaluate information regarding the contract employer's safety performance and program: a) Polyphase Part II & methanol recovery process The performance and safety program for contractors repairing piping for T-7119, including but not limited to R&S Contracting, was not evaluated prior to the start of their work. Violation occurred on or about 11/28/23.
Recent events (3)
- — F (O) $5000
- — C (S) $10046
- — Z (S) $10046
1910.119 J04 I
- Issued
- Jan 10, 2024
- Abate by
- May 30, 2024
- Penalty
- Initial $14,063 · Current $14,650
General-duty citation text
29 CFR 1910.119(j)(4)(i): The employer did not perform inspection and tests on process equipment: a) Polyphase Part II & methanol recovery process - Inspections were not conducted for process piping, including but not limited to piping segments from T-206 to E-206C, from reactor R7149 to E-7149A, from T-7119 to fractionator. b) Polyphase Part II & methanol recovery process - Formal internal and external inspections for above ground storage tanks including T-203 & T-206, were not being conducted as per STI SP001-2011. c) Polyphase Part II & methanol recovery process - Inspection for corrosion under insulation for vessels and tanks, including but not limited to CL-7160, R-7149, T-203, T-206, T-7152, T-7119 were not being conducted as per STI SP001 and API 510. d) Polyphase Part II & methanol recovery process - Inspections on T-7119 mother liquor tank's safety systems such the level indicator interlock and vent condenser as well as inspections as per STI SP001-2011 have not been conducted. e) Polyphase Part II & methanol recovery process - Sparkler filter F-7115, has not been inspection as per API 510 nor has it been receiving its weekly cleaning as required in the employer's preventative maintenance schedule. f) Polyphase Part II & methanol recovery process - Reactor R-7149 inspections as per API 510 were not being conducted, nor inspection for safety systems on the vessel, such as but not limited to high level switch, and reactor system pump seals. Violations occurred on or about 11/2/23.
Recent events (3)
- — F (S) $14650
- — C (S) $14063
- — Z (S) $14063
1910.119 J04 III
- Issued
- Jan 10, 2024
- Abate by
- May 30, 2024
- Penalty
- Initial $14,063 · Current $14,650
General-duty citation text
29 CFR 1910.119(j)(4)(iii): The frequency of inspections and tests of process equipment to maintain its mechanical integrity, was not consistent with applicable manufacturer's recommendations and good engineering practices, or more frequently determined to be necessary by prior operating experience: Location: Polyphase Part II & methanol recovery process a) R-7149 agitator lubrication preventative maintenance was not being completed monthly as identified in the PM Summary table. b) F-7115 Sparkler filter weekly cleaning was not being completed weekly as identified in the PM Summary table. c) T-7119 agitator lubrication preventative maintenance was not being completed monthly as identified in the PM Summary table. Violations occurred on or about 11/28/23.
Recent events (3)
- — F (S) $14650
- — C (S) $14063
- — Z (S) $14063
1910.119 J04 IV
- Issued
- Jan 10, 2024
- Abate by
- May 30, 2024
- Penalty
- Initial $10,046 · Current $14,650
General-duty citation text
29 CFR 1910.119(j)(4)(iv): The employer did not document each inspection and test that was performed on process equipment: a) Reactor R-7149 Inspection and test documentation for Reactor R-7149 indicated the vent condenser inspection, shaft mount inspections, and agitator lubrication were completed. However, documentation did not include the results of the inspection or test. b) Mother Liquor T-7119 Inspection and test documentation for T-7119 indicated the agitator lubrication was completed. However, documentation did not include the results of the inspection or test. c) Sparkler Filter F-7115 Inspection and test documentation for F-7115 indicated the rupture disk inspection and the cleaning were completed. However, documentation did not include the results of the inspection or test. Violations occurred on or about 11/28/23.
Recent events (3)
- — F (S) $14650
- — C (S) $10046
- — Z (S) $10046
1910.119 J05
- Issued
- Jan 10, 2024
- Abate by
- May 30, 2024
- Penalty
- Initial $14,063 · Current $14,650
General-duty citation text
29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that were outside acceptable limits (defined by the process safety information on paragraph (d) of this section) in a safe and timely manner when necessary means were not taken to assure safe operation: a) Polyphase Part II & methanol recovery process Several valves upstream to the mother liquor tank T-7119 were severely corroded, including with missing valve handles, but in methanol service. Valves included VP-7370, VP-7369, VP-7367, and an unidentified 1-inch ball valve between VP-7101 and VP-7367. Violation occurred on or about 7/12/23.
Recent events (3)
- — F (S) $14650
- — C (S) $14063
- — Z (S) $14063
1910.119 N
- Issued
- Jan 10, 2024
- Abate by
- Mar 26, 2024
- Penalty
- Initial $14,063 · Current $5,241 Reduced
General-duty citation text
29 CFR 1910.119(n): The employer's emergency action plan did not include procedures for handling releases: a) Polyphase part II and methanol recovery process area PSM11 for Emergency Evacuation Plan did not include procedures for mitigating release, including small spills of highly hazardous chemicals, including but not limited to methanol. Violation occurred on or about 11/2/23.
Recent events (3)
- — F (O) $5240.5
- — C (S) $14063
- — Z (S) $14063
1910.120 Q06
- Issued
- Jan 10, 2024
- Abate by
- Mar 26, 2024
- Penalty
- Initial $14,063 · Current $5,000 Reduced
General-duty citation text
29 CFR 1910.120(q)(6): The employer did not provide training in accordance with 29 CFR 1910.120(q)(6)(i) through (q)(6)(v) for employees who participated in or were expected to participate in emergency response: a) Facility Employees responded to mitigate and clean up chemical spills, including but not limited to methanol, without training based on their level of response. Violation occurred on or about 11/3/23.
Recent events (3)
- — F (O) $5000
- — C (S) $14063
- — Z (S) $14063
More inspections at Troy Chemical Corporation
View Troy Chemical Corporation's full OSHA safety record →
More inspections in this industry (NAICS 325510)
More inspections in NJ
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346808405.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.