ERIE, PA —
OSHA Inspection: AMERICAN TINNING & GALVANIZING COMPANY
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of AMERICAN TINNING & GALVANIZING COMPANY in 552 WEST 12TH STREET, ERIE, PA 16501 (NAICS 332813). OSHA activity number 346927387.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- AMERICAN TINNING & GALVANIZING COMPANY
- Site address
- 552 WEST 12TH STREET
- City
- ERIE
- State
- PA
- ZIP
- 16501
- Mailing
- 552 WEST 12TH STREET, ERIE, PA 16501
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332813
- Employees
- 78
- Ownership type
- A
Citations
7 citations on file for this inspection.
1910.147 C07 I B
- Issued
- Sep 25, 2023
- Abate by
- Oct 20, 2023
- Penalty
- Initial $5,313 · Current $1,850 Reduced
General-duty citation text
29 CFR 1910.147(c)(7)(i)(B):Affected employees were not instructed in the purpose and use of the energy control procedure: a.) American Tinning and Galvanizing Company; 552 West 12th Street, Erie, PA - On or about 8/22/23, and at times prior thereto, affected employees were not receiving lockout/tagout training. Employees worked with and around cranes, conveyors, and forklifts. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1850
- — Z (S) $5313
1910.178 A04
- Issued
- Sep 25, 2023
- Abate by
- Oct 20, 2023
- Penalty
- Initial $5,313 · Current $5,300 Reduced
General-duty citation text
29 CFR 1910.178(a)(4): Modifications or additions which affect capacity and safe operation of powered industrial truck were performed by the employer without the manufacturer's prior written approval. Capacity, operation, and maintenance instruction plates, tags or decals of the powered industrial truck were not changed accordingly: a.) American Tinning and Galvanizing Company, 552 W. 12th Street, Erie, PA: On or about 8/22/2023 and times prior thereto, a Mitsubishi forklift (model: FGC25N) (serial: AF82F52925) was being used with a man basket to lift employees. The company had not received the forklift manufacturer's approval to use the attachment. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $5300
- — Z (S) $5313
1910.178 A05
- Issued
- Sep 25, 2023
- Abate by
- Oct 20, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.178(a)(5): Powered industrial truck(s) equipped with front-end attachments other than factory installed attachments require the user to request that the truck be marked to identify the attachments and show the approximate weight of the truck and attachment combination at maximum elevation with load laterally centered: a.) American Tinning and Galvanizing Company, 552 W. 12th Street, Erie, PA: On or about 8/22/2023 and times prior thereto, a Mitsubishi forklift (model: FGC25N) (serial: AF82F52925) was being used with a man basket to lift employees. The forklift plate had not been changed to show the attachment. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.212 A01
- Issued
- Sep 25, 2023
- Abate by
- Oct 20, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by moving parts, point of operation, ingoing nip points, rotating parts, flying chips and sparks: a.) American Tinning and Galvanizing Company, 552 W. 12th Street, Erie, PA: On or about 8/22/2023 and times prior thereto, a Mitsubishi forklift (model: FGC25N) (serial: AF82F52925) was being used with a man basket to lift employees. The employees were exposed to moving chains and the mast of the forklift while being lifted in the man basket. The basket was not equipped with shields, barriers, and/or guarding to keep employees hands and other body parts out of the moving parts associated with the forklifts mast. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.1200 H01
- Issued
- Sep 25, 2023
- Abate by
- Oct 20, 2023
- Penalty
- Initial $7,969 · Current $1,850 Reduced
General-duty citation text
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area: a.) American Tinning and Galvanizing Company; 552 West 12th Street, Erie, PA - On or about 8/22/23, and at times prior thereto, employees were not receiving specific Hazard Communication training upon initial hire when working with and around chemicals. Chemicals the employees work with and around, included, but were not limited to, sulfuric acid, galvanizing flux, and chromic acid during dipping/anodizing of aluminum onsite. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1850
- — Z (S) $7969
1904.29 B01
- Issued
- Sep 25, 2023
- Abate by
- Oct 20, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1904.29(b)(1):A log of all recordable work-related injuries and illness (OSHA Form 300 or equivalent) was not completed in the detail required by the regulation. a.) American Tinning and Galvanizing Company - On or about 8/22/23, and at times prior thereto, the company was not filling out Column F of the 300 log in the detail required. The company did not record the injury on the log. This occurred on recordable #7 in Calendar Year 2023. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.134 C02 I
- Issued
- Sep 25, 2023
- Abate by
- Oct 20, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.134(c)(2)(i):Respirator users were not provided with the information contained in Appendix D to 29 CFR 1910.134 when the employer determined that any voluntary respirator use was permissible: a.) American Tinning & Galvanizing Company; 552 West. 12th Street, Erie, PA - On or about 8/22/23, and at times prior thereto, the company provided N95 respirators to the employees on a voluntary basis. The employees had not been provided a copy and trained on Appendix D of the OSHA respirator standard. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at American Tinning & Galvanizing Company
View American Tinning & Galvanizing Company's full OSHA safety record →
More inspections in this industry (NAICS 332813)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346927387.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.