BARRIGADA, GU —
OSHA Inspection: GIANT CONSTRUCTION CORPORATION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of GIANT CONSTRUCTION CORPORATION in INTERSECTION OF WEST SUNSET BLVD AND FOURTH STREET, BARRIGADA, GU 96913 (NAICS 237110). OSHA activity number 347045882.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- GIANT CONSTRUCTION CORPORATION
- Site address
- INTERSECTION OF WEST SUNSET BLVD AND FOURTH STREET
- City
- BARRIGADA
- State
- GU
- ZIP
- 96913
- Mailing
- P.O. BOX 9578, TAMUNING, GU 96931
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 237110
- Employees
- 19
- Ownership type
- A
Citations
11 citations on file for this inspection.
1926.651 C02
- Issued
- Apr 16, 2024
- Abate by
- Apr 22, 2024
- Penalty
- Initial $11,292 · Current $5,985 Reduced
General-duty citation text
29 CFR 1926.651(c)(2): A stairway, ladder, ramp or other safe means of egress was not located in trench excavations that were 4 feet (1.22m) or more in depth so as to require no more than 25 feet (7.62m) of lateral travel for employees: The employer does not provide means of egress for each employee performing work in trenches by using a stairway, ladder, ramp, or other safe means of egress designed in accordance with paragraph (c) of 29 CFR 1926.651. This violation was observed on or about October 20, 2023; at SMH 21 to SMH 20 Sewer Lateral Trench, where a means of egress for each employee was not provided for employees prepping and installing sewer lines in a trench greater than four feet in depth. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure employees are provided means of egress in trenches greater than four feet in depth.
Recent events (3)
- — F (S) $5985
- — C (S) $11292
- — Z (S) $11292
1926.651 C02
- Issued
- Apr 16, 2024
- Abate by
- Apr 22, 2024
- Penalty
- Initial $11,292 · Current $5,985 Reduced
General-duty citation text
29 CFR 1926.651(c)(2): A stairway, ladder, ramp or other safe means of egress was not located in trench excavations that were 4 feet (1.22m) or more in depth so as to require no more than 25 feet (7.62m) of lateral travel for employees: The employer does not provide means of egress for each employee performing work in trenches by using a stairway, ladder, ramp, or other safe means of egress designed in accordance with paragraph (c) of 29 CFR 1926.651. This violation occurred on or about November 15, 2023; at 143 L.F. Sewer line excavation, where a means of egress for each employee was not provided for employees prepping and installing sewer lines in a trench greater than four feet in depth. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure employees are provided means of egress in trenches greater than four feet in depth.
Recent events (3)
- — F (S) $5985
- — C (S) $11292
- — Z (S) $11292
1926.652 A01
- Issued
- Apr 16, 2024
- Abate by
- Apr 22, 2024
- Penalty
- Initial $112,926 · Current $0 Reduced
General-duty citation text
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652 (b) or (c). The employer does not protect each employee performing work in trenches by properly sloping or benching the trenches or using appropriate protective systems designed in accordance with paragraph (b) or (c) of 29 CFR 1926.652. This violation occurred on or about October 19, 2023; at SMH 21 to SMH 20 cleanout excavation, where cave in protection was not provided for employees prepping and installing sewer lines in a trench greater than five feet in depth. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure employees are protected from cave in hazards by ensuring trenches greater than 5 feet in depth are properly sloped, benched, or equipped with appropriate protective systems.
Recent events (3)
- — F (W) $0
- — C (W) $112926
- — Z (W) $112926
1926.652 A01
- Issued
- Apr 16, 2024
- Abate by
- Apr 22, 2024
- Penalty
- Initial $112,926 · Current $59,859 Reduced
General-duty citation text
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652 (b) or (c). The employer does not protect each employee performing work in trenches by properly sloping or benching the trenches or using appropriate protective systems designed in accordance with paragraph (b) or (c) of 29 CFR 1926.652. This violation was observed on October 20, 2023; at SMH 21 to SMH 20 sewer lateral trench, where cave in protection was not provided for employees prepping and installing sewer lines in a trench 11-feet in depth. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure employees are protected from cave in hazards by ensuring trenches greater than 5 feet in depth are properly sloped, benched, or equipped with appropriate protective systems.
Recent events (3)
- — F (W) $59859
- — C (W) $112926
- — Z (W) $112926
1926.652 A01
- Issued
- Apr 16, 2024
- Abate by
- Apr 22, 2024
- Penalty
- Initial $112,926 · Current $59,859 Reduced
General-duty citation text
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652 (b) or (c). The employer does not protect each employee performing work in trenches by properly sloping or benching the trenches or using appropriate protective systems designed in accordance with paragraph (b) or (c) of 29 CFR 1926.652. This violation occurred on or about October 23, 2023; at SMH 9-10 excavation, where cave in protection was not provided for employees installing sewer lines in a trench greater than five feet in depth. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure employees are protected from cave in hazards by ensuring trenches greater than 5 feet in depth are properly sloped, benched, or equipped with appropriate protective systems.
Recent events (3)
- — F (W) $59859
- — C (W) $112926
- — Z (W) $112926
1926.652 A01
- Issued
- Apr 16, 2024
- Abate by
- Apr 22, 2024
- Penalty
- Initial $112,926 · Current $59,859 Reduced
General-duty citation text
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652 (b) or (c). The employer does not protect each employee performing work in trenches by properly sloping or benching the trenches or using appropriate protective systems designed in accordance with paragraph (b) or (c) of 29 CFR 1926.652. This violation occurred on or about October 24, 2023; at SMH 28 to SMH 29 Sewer Lateral Trench, where cave in protection was not provided for employees prepping and installing sewer lines in a trench greater than five feet in depth. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure employees are protected from cave in hazards by ensuring trenches greater than 5 feet in depth are properly sloped, benched, or equipped with appropriate protective systems.
Recent events (3)
- — F (W) $59859
- — C (W) $112926
- — Z (W) $112926
1926.652 A01
- Issued
- Apr 16, 2024
- Abate by
- Apr 22, 2024
- Penalty
- Initial $112,926 · Current $59,859 Reduced
General-duty citation text
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652 (b) or (c). The employer does not protect each employee performing work in trenches by properly sloping or benching the trenches or using appropriate protective systems designed in accordance with paragraph (b) or (c) of 29 CFR 1926.652. This violation occurred on or about October 25, 2023; at SMH 29 to SMH 5 excavation, where cave in protection was not provided for employees installing sewer lines in a trench greater than five feet in depth. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure employees are protected from cave in hazards by ensuring trenches greater than 5 feet in depth are properly sloped, benched, or equipped with appropriate protective systems.
Recent events (3)
- — F (W) $59859
- — C (W) $112926
- — Z (W) $112926
1926.652 A01
- Issued
- Apr 16, 2024
- Abate by
- Apr 22, 2024
- Penalty
- Initial $112,926 · Current $59,859 Reduced
General-duty citation text
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652 (b) or (c). The employer does not protect each employee performing work in trenches by properly sloping or benching the trenches or using appropriate protective systems designed in accordance with paragraph (b) or (c) of 29 CFR 1926.652. This violation occurred on or about November 2, 2023; at SMH Riser 33 excavation, where cave in protection was not provided for employees prepping and installing a manhole in a trench greater than five feet in depth. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure employees are protected from cave in hazards by ensuring trenches greater than 5 feet in depth are properly sloped, benched, or equipped with appropriate protective systems.
Recent events (3)
- — F (W) $59859
- — C (W) $112926
- — Z (W) $112926
1926.652 A01
- Issued
- Apr 16, 2024
- Abate by
- Apr 22, 2024
- Penalty
- Initial $112,926 · Current $59,859 Reduced
General-duty citation text
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652 (b) or (c). The employer does not protect each employee performing work in trenches by properly sloping or benching the trenches or using appropriate protective systems designed in accordance with paragraph (b) or (c) of 29 CFR 1926.652. This violation occurred on or about November 3, 2023; at SMH 2 to SMH 34 excavation, where cave in protection was not provided for employees prepping and installing sewer lines in a trench greater than five feet in depth. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure employees are protected from cave in hazards by ensuring trenches greater than 5 feet in depth are properly sloped, benched, or equipped with appropriate protective systems.
Recent events (3)
- — F (W) $59859
- — C (W) $112926
- — Z (W) $112926
1926.652 A01
- Issued
- Apr 16, 2024
- Abate by
- Apr 22, 2024
- Penalty
- Initial $112,926 · Current $59,859 Reduced
General-duty citation text
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652 (b) or (c). The employer does not protect each employee performing work in trenches by properly sloping or benching the trenches or using appropriate protective systems designed in accordance with paragraph (b) or (c) of 29 CFR 1926.652. This violation occurred on or about November 6, 2023; at SMH 33 to SMH 17 Excavation, where cave in protection was not provided for employees prepping and installing sewer lines in a trench greater than five feet in depth. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure employees are protected from cave in hazards by ensuring trenches greater than 5 feet in depth are properly sloped, benched, or equipped with appropriate protective systems.
Recent events (3)
- — F (W) $59859
- — C (W) $112926
- — Z (W) $112926
1926.652 A01
- Issued
- Apr 16, 2024
- Abate by
- Apr 22, 2024
- Penalty
- Initial $112,926 · Current $59,862 Reduced
General-duty citation text
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652 (b) or (c). The employer does not protect each employee performing work in trenches by properly sloping or benching the trenches or using appropriate protective systems designed in accordance with paragraph (b) or (c) of 29 CFR 1926.652. This violation occurred on or about November 15, 2023; at the 143 L.F. Sewer line excavation, where cave in protection was not provided for employees installing sewer lines in a trench greater than five feet in depth. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure employees are protected from cave in hazards by ensuring trenches greater than 5 feet in depth are properly sloped, benched, or equipped with appropriate protective systems.
Recent events (3)
- — F (W) $59862
- — C (W) $112926
- — Z (W) $112926
More inspections at Giant Construction Corporation
View Giant Construction Corporation's full OSHA safety record →
More inspections in this industry (NAICS 237110)
More inspections in GU
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347045882.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.