Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: CORRY RUBBER CORPORATION

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of CORRY RUBBER CORPORATION in 601 W. MAIN STREET, CORRY, PA 16407 (NAICS 325212). OSHA activity number 348333360.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Corry Rubber Corporation — free Get an email when a new federal OSHA severe-injury report for Corry Rubber Corporation is published. One employer, no account, unsubscribe in one click.
Site address
601 W. MAIN STREET
City
CORRY
State
PA
ZIP
16407
Mailing
601 W. MAIN STREET, CORRY, PA 16407
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
325212
Employees
53
Ownership type
A

12 citations on file for this inspection.

1910.28 B01 I

Serious Gravity 10 3 instances 10 exposed
Issued
Sep 30, 2025
Abate by
Dec 17, 2025
Penalty
Initial $11,585 · Current $4,000 Reduced
29 CFR  1910.28(b)(1)(i):Except as provided elsewhere in this section 29 CFR 1910.28, the employer did not ensure that each employee on a walking-working surface with an unprotected side or edge that is 4 feet (1.2 m) or more above a lower level is protected from falling by one or more of the systems described in 29 CFR 1910.28(b)(1)(i):  a.)  Corry Rubber Corporation, roof outside of paint shop  access platform - On or about 6/25/25, and at times prior thereto, the guardrail on the roof had an opening of approximately 1 foot between the unsecured guardrail and the secured guardrail as it approached the landing platform where employees access the roof.   ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $4000
  • — Z (S) $11585

1910.28 B13 III A

Serious Gravity 10 3 instances 10 exposed
Issued
Sep 30, 2025
Abate by
Dec 17, 2025
Penalty
Initial $0 · Current $0
29 CFR 1910.28(b)(13)(iii)(A): When work is performed 15 feet (4.6 m) or more from the roof edge, the employer did not protect each employee from falling by a guardrail system, safety net system, travel restraint system, or personal fall arrest system or a designated area. The employer is not required to provide any fall protection, provided the work is both infrequent and temporary.  a.)  Corry Rubber Corporation, roof outside of paint shop - On or about 6/25/25, and at times prior thereto, employees were required to walk outside of the guardrail system to  grease the cooling tower fan.   Employees do not have any type of fall protection when outside of the guardrail system.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.29 B03

Serious Gravity 10 3 instances 10 exposed
Issued
Sep 30, 2025
Abate by
Dec 17, 2025
Penalty
Initial $0 · Current $0
29 CFR 1910.29(b)(3): The employer did not ensure that guardrail systems are capable of withstanding, without failure, a force of at least 200 pounds (890 N) applied in a downward or outward direction within 2 inches (5 cm) of the top edge, at any point along the top rail.  a.)  Corry Rubber Corporation,  roof outside of paint shop - On or about 6/25/25, and at times prior thereto,  a guardrail on the roof was not secured to the roof.  The railing was free standing and moved easily with any pressure applied to it.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.147 C04 II

Serious Gravity 5 1 instance 10 exposed
Issued
Sep 30, 2025
Abate by
Dec 17, 2025
Penalty
Initial $5,627 · Current $3,000 Reduced
29 CFR  1910.147(c)(4)(ii):Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D):  a.)   Corry Rubber Corporation - On or about 6/25/25, and at times prior thereto, the lockout/tagout procedures did not list the magnitudes of energy.  Energy sources, included, but were not limited to, mechanical, hydraulic and pneumatic.  Employees perform servicing and maintenance on equipment including but not limited to cooling tower fan and  presses.   ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $3000
  • — Z (S) $5627

1910.147 C06 I

Serious Gravity 5 1 instance 10 exposed
Issued
Sep 30, 2025
Abate by
Dec 17, 2025
Penalty
Initial $0 · Current $0
29 CFR  1910.147(c)(6)(i):The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed:  a.)  Corry Rubber Corporation - On or about 6/25/25, and at times prior thereto,  an  periodic inspection of the lockout/tagout procedures had not been conducted.  Employees perform servicing and maintenance on equipment including but not limited to cooling tower fan and  presses.   ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.147 D

Serious Gravity 5 2 instances 5 exposed
Issued
Sep 30, 2025
Abate by
Dec 17, 2025
Penalty
Initial $0 · Current $0
29 CFR  1910.147(d):The established procedure for the application of energy control (the lockout or tagout procedures) did not cover the actions listed in and was not done in sequence as required by 29 CFR 1910.147(d)(1)-(6):    b.)  Corry Rubber Corporation - On or about 6/25/25, and at times prior thereto, employees did not lockout prior to servicing operations on equipment including, but not limited to, injection presses and manual presses.  Employees are periodically required to  perform set up and maintenance on the presses.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.147 C07 I

Serious Gravity 5 1 instance 5 exposed
Issued
Sep 30, 2025
Abate by
Dec 17, 2025
Penalty
Initial $0 · Current $0
29 CFR  1910.147(c)(7)(i): The employer did not provide adequate training to ensure that the purpose and function of the energy control program was understood by employees:  a.)  Corry Rubber Corporation - On or about 6/25/25, and at times prior thereto,   the company did not provide lockout/tagout training to authorized employees  who performed lockout/tagout on  equipment including, but not limited to, presses.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.215 A04

Serious Gravity 5 1 instance 10 exposed
Issued
Sep 30, 2025
Abate by
Dec 17, 2025
Penalty
Initial $5,627 · Current $3,000 Reduced
29 CFR  1910.215(a)(4):  Work rest(s) on grinding machinery were not adjusted closely to the wheel with a maximum opening of one eighth inch:  a.)  Corry Rubber Corporation, maintenance department - On or about 6/25/25, and at times prior thereto,  the Eagle bench grinder  work rest was 1/2 inch away from the grinding wheel.  Employees use the grinder weekly to sharpen lathe tooling.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $3000
  • — Z (S) $5627

1910.215 B09

Serious Gravity 5 1 instance 10 exposed
Issued
Sep 30, 2025
Abate by
Dec 17, 2025
Penalty
Initial $0 · Current $0
29 CFR  1910.215(b)(9): The distance between the abrasive wheel periphery(s) and the adjustable tongue or the end of the safety guard peripheral member at the top exceeded one fourth inch:  a.) Corry Rubber Corporation, maintenance department- on or about 6/25/25 and times prior thereto: The tongue guard for the grinding wheel on the Eagle bench grinder  was positioned 3/4 inch away from the grinding wheel.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.303 B02

Serious Gravity 5 1 instance 5 exposed
Issued
Sep 30, 2025
Abate by
Dec 17, 2025
Penalty
Initial $5,627 · Current $3,000 Reduced
29 CFR  1910.303(b)(2):Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling:  a.)  Corry Rubber Corporation, upstairs paint room - On or about  6/25/25, and at times prior thereto, a surge protector was being used that was listed and labeled for household use only.  The surge protector was powering fans in the adjacent room  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $3000
  • — Z (S) $5627

1910.303 G01 II

Serious Gravity 1 1 instance 10 exposed
Issued
Sep 30, 2025
Abate by
Dec 17, 2025
Penalty
Initial $0 · Current $0
29 CFR  1910.303(g)(1)(ii):The required working space about electric equipment rated 600 volts, nominal, or less to ground, was used for storage:  a.)  Corry Rubber Corporation, 2nd floor sandblasting area - On or about 6/25/25, and at times prior thereto,  the area in front of electrical panel boxes and electrical disconnects were used for storage.  Items  stored in front of the electrical equipment, included, but was not limited to,  cardboard boxes of parts.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.305 G01 IV A

Serious Gravity 5 1 instance 10 exposed
Issued
Sep 30, 2025
Abate by
Dec 17, 2025
Penalty
Initial $0 · Current $0
29 CFR  1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure:  a.)  Corry Rubber Corporation, 2nd floor, sand blasting/paint room - On or about 6/25/25, and at times prior thereto,  fans were being powered by extension cords that were run to a power tap and an electrical outlet.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Corry Rubber Corporation's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348333360.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.