SCHOFIELD, WI —
OSHA Inspection: CRYSTAL FINISHING SYSTEMS, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of CRYSTAL FINISHING SYSTEMS, INC. in 4704 BAYBERRY ST, SCHOFIELD, WI 54476 (NAICS 423510). OSHA activity number 344234943.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CRYSTAL FINISHING SYSTEMS, INC.
- Site address
- 4704 BAYBERRY ST
- City
- SCHOFIELD
- State
- WI
- ZIP
- 54476
- Mailing
- 4704 BAYBERRY ST., SCHOFIELD, WI 54476
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 423510
- Employees
- 600
- Ownership type
- A
Citations
4 citations on file for this inspection.
1910.147 C07 I A
- Issued
- Dec 4, 2019
- Penalty
- Initial $8,856 · Current $6,199 Reduced
General-duty citation text
29 CFR 1910.147(c)(7)(i)(A): Authorized employee(s) did not receive training in the recognition of applicable hazardous energy sources, the type and magnitude of the energy available in the workplace, and the methods and means necessary for energy isolation and control. a) On or about 8/20/2019, Employee entered gated conveyor area for Metl saw without locking out machine which she had not received specific lockout instruction training for creating a struck by hazard.
Recent events (2)
- — I (S) $6199.2
- — Z (S) $8856
1910.147 D
- Issued
- Dec 4, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(d): The established procedure for the application of energy control (the lockout or tagout procedures) did not cover the actions listed in and was not done in sequence as required by 29 CFR 1910.147(d)(1)-(6): a) On or about 8/20/2019, an employee entered the gated area of the Metl Saw, and did not follow the required steps of Lockout prior to engaging in the servicing and/or maintenance activity. As a result, the remaining applicable energy control elements, involving machine isolation [1910.147(d)(3)], lockout/tagout device application [1910.147(d)(4)], dissipation of residual energy [1910(d)(5)(i)], and verification of isolation [1910.147(d)(6)] were not implemented to protect employees from machine hazards.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.151 C
- Issued
- Dec 4, 2019
- Penalty
- Initial $8,856 · Current $6,199 Reduced
General-duty citation text
29 CFR 1910.151(c): Where employees were exposed to injurious corrosive materials, suitable facilities for quick drenching or flushing of the eyes and body were not provided within the work area for immediate emergency use: a) On or about 8/20/2019, Employees handling PPG SPECTRACON GXA ACID CATALYST and PPG CLEAR ACRYLIC TOPCOAT in the paint kitchens did not have suitable facilities for quick drenching or flushing of the eyes and body readily available for emergency use. Hazards listed on the SDS for both products included serious eye damage and severe skin burns for the ACID CATALYST. b) On or about 8/21/2019, Employee filling floor sweeper in Building #6 with NUBLEND Dual Draw 1 A HD alkaline Base and DUAL DRAW 1B PE SURFACTANT BLEND did not have suitable facilities for quick drenching or flushing of the eyes and body readily available for emergency use. Hazards listed on the SDS for both products included severe skin burns and eye damage.
Recent events (2)
- — I (S) $6199.2
- — Z (S) $8856
1910.212 A03 II
- Issued
- Dec 4, 2019
- Abate by
- Jan 10, 2020
- Penalty
- Initial $8,856 · Current $6,199 Reduced
General-duty citation text
29 CFR 1910.212(a)(3)(ii): Point of operation guards were not designed and constructed as to prevent the operator from having any part of their body in the danger zone during the operating cycle: a) On or about 8/20/2019, Point of operation guards on Metl Saw were not adequate to prevent contact with sawblade creating an amputation hazard. Outfeed hinged guard was not secured or interlocked.
Recent events (2)
- — I (S) $6199.2
- — Z (S) $8856
More inspections at Crystal Finishing Systems, INC.
View Crystal Finishing Systems, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 423510)
More inspections in WI
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344234943.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.