Safety Incidents OSHA Severe Injury Reports · 2015–2025
2,004,209Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: BRECKNOCK BUILDERS LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of BRECKNOCK BUILDERS LLC in 201 SCHOOL LANE AVENUE, EPHRATA, PA 17522 (NAICS 236220). OSHA activity number 345879548.

Watch Brecknock Builders LLC — free Get an email when a new federal OSHA severe-injury report for Brecknock Builders LLC is published. One employer, no account, unsubscribe in one click.
Site address
201 SCHOOL LANE AVENUE
City
EPHRATA
State
PA
ZIP
17522
Mailing
615 LAUSCHTOWN ROAD, DENVER, PA 17517
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
40
Ownership type
A

6 citations on file for this inspection.

1926.102 A01

Serious Gravity 5 2 instances 2 exposed
Issued
Abate by
Penalty
Initial $6381.00 · Current $6381.00
29 CFR  1926.102(a)(1): The employer did not ensure that each affected employee used appropriate eye or face protection when exposed to eye or face hazards from flying objects while using a nail gun.   (a) 201 School Lane Avenue, Ephrata, PA, East-facing exterior of the garage - On or about April 5, 2022, employees were operating  pneumatic nail guns without eye protection.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $6381

1926.501 B01

Serious Gravity 10 2 instances 2 exposed
Issued
Abate by
Penalty
Initial $11167.00 · Current $11167.00
29 CFR  1926.501(b)(1):Employees on walking/working surfaces with an unprotected side and/or edge which is 6 feet or more above a lower level were not protected from falling by guardrail systems, safety net systems, or personal fall arrest systems.  (a) 201 School Lane Avenue, Ephrata, PA, West-facing exterior of the garage - On or about April 5, 2022, an employee was observed working on a flat roof which was 12 feet and 10.5 inches above grade and approximately 45 inches wide without fall protection.   (b) 201 School Lane Avenue, Ephrata, PA, East-facing exterior of the garage - On or about April 5, 2022, an employee was observed working on a flat roof which was 13 feet above grade and approximately 48 inches wide without fall protection.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $11167

1926.503 A01

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards:   (a)  201 School Lane Avenue, Ephrata, PA, West-facing exterior of the garage - On or about April 5, 2022, an employee was exposed to a fall hazard while working on a platform which was 12 feet and 10.5 inches above grade without fall protection training.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1926.1051 A

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $7977.00 · Current $7977.00
29 CFR  1926.1051(a): Stairway(s) or ladder(s) were not provided at all personnel points of access where there was a break in elevation of 19 inches (48 cm) or more, or no ramp, runway, sloped embankment, or personnel hoist was provided.   (a) 201 School Lane Avenue, Ephrata, PA, East-facing garage exterior - On or about April 5, 2022, an employee climbed down from a work roof  to a lower roof with a change in elevation of 5.5 feet  by using a  roughed out section of the wall exterior.  The employer did not ensure employees were provided with personnel points of access.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $7977

1926.1053 B04

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1926.1053(b)(4):Ladder(s) were used for purposes other than the purpose for which they were designed:  (a) 201 School Lane Avenue, Ephrata, PA, East-facing exterior of the garage - On or about April 5, 2022, an employee used a 8 foot a-frame ladder to access and egress a lower roof.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1926.1053 B13

Serious Gravity 5 1 instance 1 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1926.1053(b)(13): The top or top step of a stepladder was used as a step:   (a) 201 School Lane Avenue, Ephrata, PA, East-facing exterior of the garage - On or about April 5, 2022, an employee was exposed to a fall hazard of approximately 7 feet 5 inches by stepping on the top or top step of an A-frame ladder.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

View BRECKNOCK BUILDERS LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345879548.