On , OSHA opened a complaint safety inspection of CORRY FABRICATION, LLC in 21 MAPLE AVENUE, CORRY, PA 16407 (NAICS 332322). OSHA activity number 347296063.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CORRY FABRICATION, LLC
- Site address
- 21 MAPLE AVENUE
- City
- CORRY
- State
- PA
- ZIP
- 16407
- Mailing
- 21 MAPLE AVENUE, CORRY, PA 16407
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332322
- Employees
- 62
- Ownership type
- A
Citations
7 citations on file for this inspection.
1910.147 C04 I
- Issued
- Jul 17, 2024
- Abate by
- Nov 12, 2024
- Penalty
- Initial $6,453 · Current $4,000 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(i):Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: A.) Corry Fabrication, LLC, on or about 2/22/24 and times prior thereto: Specific Lockout Tagout procedures were not developed for equipment including but limited to oven, crane, and laser. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $4000
- — Z (S) $6453
1910.147 E03
- Issued
- Jul 17, 2024
- Abate by
- Nov 12, 2024
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(e)(3):Specific procedures and training that were developed, documented and incorporated into the employer's energy control program for removal of a lockout or tagout device under the direction of the employer when the authorized employee A.) Corry Fabrication, LLC, on or about 2/22/24 and times prior thereto: employees periodically conducted service, maintenance, and repairs on equipment. The energy control procedure developed for use during removal of a lockout device by someone other than the authorized employee who applied it situations, were not specific and/or require specific procedural steps prior to and after the removal of the lock. Equipment includes but is not limited to cranes, lasers, and hydraulic equipment. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 F02 I
- Issued
- Jul 17, 2024
- Abate by
- Aug 12, 2024
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(f)(2)(i): When outside servicing personnel were engaged in activities in a facility, the onsite employer and the outside employer did not inform each other of their respective lockout or tagout procedures: A.) Corry Fabrication, LLC, on or about 2/22/24 and times prior thereto: The employer periodically used outside contractors for servicing maintenance and repairs to equipment in the facility including but not limited to, the elevator and the burn off oven. specific procedures were not developed and implemented for outside contractors performing lockout. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C06 I
- Issued
- Jul 17, 2024
- Abate by
- Nov 12, 2024
- Penalty
- Initial $9,680 · Current $4,000 Reduced
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: A.) Corry Fabrication, LLC, First Floor, on or about 2/22/24 and times prior thereto: The employer did not conduct periodic inspections for authorized employees. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement
Recent events (2)
- — I (S) $4000
- — Z (S) $9680
1910.147 C07 I
- Issued
- Jul 17, 2024
- Abate by
- Aug 12, 2024
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(7)(i):The employer did not provide adequate training to ensure that the purpose and function of the energy control program was understood by employees: A.) Corry Fabrication, LLC, on or about 2/22/24 and times prior thereto: Employees conduct service and maintenance on equipment including but not limited to cranes, lasers, and hydraulic equipment. The employer did not conduct Lockout Tagout/Hazardous Energy Control training with Authorized employees. B.) Corry Fabrication, LLC, on or about 2/22/24 and times prior thereto: Employees work around equipment that requires periodic service and maintenance. The employer did not conduct Lockout Tagout/Hazardous Energy Control training with Affected employees. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.145 C03
- Issued
- Jul 17, 2024
- Abate by
- Aug 12, 2024
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.145(c)(3):Safety instruction sign(s) were not used where there was a need for general instructions and suggestions relative to safety measure(s): A.) Corry Fabrication, LLC, on or about 2/22/24 and times prior thereto: safety instruction signs not posted on the elevator to inform that no riders are permitted until the safety gate is added. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.147 C05 II
- Issued
- Jul 17, 2024
- Abate by
- Aug 12, 2024
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(5)(ii): Lockout devices and tagout devices were utilized for other purposes than controlling energy: A.) Corry Fabrication, LLC, on or about 2/22/24 and times prior thereto: Lockout devices were not distinguished from other devices in the workplace. Other devices include but are not limited to locks to take equipment out of service. Red locks were used as both lockout devices and locks to take equipment out of service. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at Corry Fabrication, LLC
View Corry Fabrication, LLC's full OSHA safety record →
More inspections in this industry (NAICS 332322)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347296063.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.