CORRY, PA —
OSHA Inspection: CORRY FABRICATION, LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of CORRY FABRICATION, LLC in 21 MAPLE AVENUE, CORRY, PA 16407 (NAICS 332322). OSHA activity number 348104548.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CORRY FABRICATION, LLC
- Site address
- 21 MAPLE AVENUE
- City
- CORRY
- State
- PA
- ZIP
- 16407
- Mailing
- 21 MAPLE AVENUE, CORRY, PA 16407
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332322
- Employees
- 65
- Ownership type
- A
Citations
8 citations on file for this inspection.
5(a)(1)
- Issued
- Aug 25, 2025
- Abate by
- Jan 15, 2026
- Penalty
- Initial $5,627 · Current $1,250 Reduced
General-duty citation text
OSH ACT of 1970 Section (5)(a)(1):The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to struck-by or caught-in hazards while operating equipment that have unprotected foot pedals: A.) Corry Fabrication, LLC, On or about 3/13/25 and times prior thereto: Employees operated the Cincinnati 9 B12 Mechanical Press Brake that uses a foot pedal for actuation. The foot pedal was not protected from actuation from falling or moving objects, or by inadvertent stepping on the foot pedal exposing employees to the hazards of getting hands and fingers struck-by or caught-in the press brake point of operation. B.) Corry Fabrication, LLC, On or about 3/13/25 and times prior thereto: Employees operated the Cincinnati B13 Mechanical Press Brake that uses a foot pedal for actuation. The foot pedal was not protected from actuation from falling or moving objects, or by inadvertent stepping on the foot pedal exposing employees to the hazards of getting hands and fingers struck-by or caught-in the press brake point of operation. ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation. This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement. IN ADDITION, abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic, or video evidence or abatement or other written records.
Recent events (2)
- — I (S) $1250
- — Z (S) $5627
1910.147 D
- Issued
- Aug 25, 2025
- Abate by
- Dec 15, 2025
- Penalty
- Initial $8,441 · Current $5,000 Reduced
General-duty citation text
29 CFR 1910.147(d):The established procedure for the application of energy control (the lockout or tagout procedures) did not cover the actions listed in and was not done in sequence as required by 29 CFR 1910.147(d)(1)-(6): A.) Corry Fabrication, LLC, On or about 3/13/25 and times prior thereto: Employees did not lockout prior to servicing operations on equipment including but not limited to press brakes. Employees are periodically required to conduct tool and die changes on the Cincinnati B12. B.) Corry Fabrication, LLC, On or about 3/13/25 and times prior thereto: Employees did not lockout prior to servicing operations on equipment including but not limited to press brakes. Employees are periodically required to conduct tool and die changes on the Cincinnati B13. E.) Corry Fabrication, LLC, On or about 3/13/25 and times prior thereto: Employees did not lockout prior to servicing operations on equipment including but not limited to presses. Employees are periodically required to conduct tool and die changes on the Pierce-All Punch Press. F.) Corry Fabrication, LLC, On or about 3/13/25 and times prior thereto: Employees did not lockout prior to servicing operations on equipment including but not limited to presses. Employees are periodically required to conduct tool and die changes on the Bliss C-60. H.) Corry Fabrication, LLC, On or about 3/13/25 and times prior thereto: Employees did not lockout prior to servicing operations on equipment including but not limited to Shears. Employees are periodically required to change blades in the Cincinnati S1. I.) Corry Fabrication, LLC, On or about 3/13/25 and times prior thereto: Employees did not lockout prior to servicing operations on equipment including but not limited to Band Saws. Employees are periodically required to change blades in the 55 DoALL. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $5000
- — Z (S) $8441
1910.147 C07
- Issued
- Aug 25, 2025
- Abate by
- Sep 19, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(7): The employer did not provided training to ensure that the purpose and function of energy control program are understood by employees and that the knowledge and skills required for the safe application, usage, and removal of the energy controls are required by employees. A.) Corry Fabrication, LLC, On or about 3/13/25 and times prior thereto: Employees designated as affected are performing authorized employee tasks and have not received authorized training. Tasks include but are not limited to changing dies, blades, and tools. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C04 I
- Issued
- Aug 25, 2025
- Abate by
- Sep 19, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: A.) Corry Fabrication, LLC, on or about 3/13/25 and times prior thereto: specific Lockout Tagout/Energy Control procedures were not developed for equipment including but limited to DoALL C-916-SA S5, SCHRODGER Group Part Bender, and Haeger 824. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 E03
- Issued
- Aug 25, 2025
- Abate by
- Sep 19, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(e)(3): When the authorized employee who applied the lockout or tagout device was not available to remove it, and the device removal is completed under the direction of the employer, specific procedures and training were not developed, documented and incorporated into the employer's energy control program: A.) Corry Fabrication, LLC, On or about 3/13/25 and times prior thereto: In the written Lockout/Tagout Plan, the procedure for the removal of locks left on equipment by someone other than the authorized employee who applied it, did not include detailed workplace specific procedures to: 1. Verify that the authorized employee who applied the device is not in the facility 2. Document how the authorized employee who applied the device will be contacted 3. Ensure that the authorized employee whose device was removed has been informed of the removal before resuming work ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.212 A03 II
- Issued
- Aug 25, 2025
- Abate by
- Jan 15, 2026
- Penalty
- Initial $8,441 · Current $5,000 Reduced
General-duty citation text
29 CFR 1910.212(a)(3)(ii):The point of operation of machines whose operation exposed an employee to injury, was not guarded: A.) Corry Fabrication, LLC, On or about 3/13/25 and times prior thereto: The Cincinnati B12 Press Brake was not adequately guarded to prevent employees from contacting the point of operation in that there were no safeguarding devices used in conjunction with the foot pedal. B.) Corry Fabrication, LLC, On or about 3/13/25 and times prior thereto: The Cincinnati B13 Press Brake was not adequately guarded to prevent employees from contacting the point of operation in that there were no safeguarding devices used in conjunction with the foot pedal. C.) Corry Fabrication, LLC, On or about 3/13/25 and times prior thereto: The Pierce All P4 Punch Press was not adequately guarded to prevent employees from contacting the point of operation in that there were no safeguarding devices used in conjunction with the foot pedal. D.) Corry Fabrication, LLC, On or about 3/13/25 and times prior thereto: The Cincinnati S1 was not adequately guarded to prevent employees from contacting the point of operation in that a section of the guard was broken off/missing. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $5000
- — Z (S) $8441
1910.217 B07 III
- Issued
- Aug 25, 2025
- Abate by
- Sep 19, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.217(b)(7)(iii): A means of selecting Off, "Inch," Single Stroke, and Continuous (when the continuous function is furnished) was not supplied with the clutch/brake control to select type of operation of the press. Fixing of selection was not by means capable of supervision by the employer. A.) Corry Fabrication, LLC, On or about 3/13/25 and times prior thereto: Press Keys were left in machines, which allowed employees to change the mode of the machine. Keys were not designated for authorized employees/supervisors. All employees could change the mode of the press, presses include but is not limited to, Bliss C-60. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.217 C01 I
- Issued
- Aug 25, 2025
- Abate by
- Sep 19, 2025
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.217(c)(1)(i):The employer did not provide and ensure the usage of point of operation guards or properly applied point of operation devices on every operation performed on mechanical power press(es): A.) Corry Fabrication, LLC, On or about 3/13/25 and times prior thereto: Point of operation devices were not properly applied and set up on equipment including, but not limited to, Bliss C-60 when set up for cutting rod. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at Corry Fabrication, LLC
View Corry Fabrication, LLC's full OSHA safety record →
More inspections in this industry (NAICS 332322)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 348104548.