GIDDINGS, TX —
OSHA Inspection: DCP MIDSTREAM, LP
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of DCP MIDSTREAM, LP in 3002 FM 448, GIDDINGS, TX 78942 (NAICS 211112). OSHA activity number 341283208.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- DCP MIDSTREAM, LP
- Site address
- 3002 FM 448
- City
- GIDDINGS
- State
- TX
- ZIP
- 78942
- Mailing
- 3002 FM 448, GIDDINGS, TX 78942
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 211112
- Employees
- 12
- Ownership type
- A
Citations
6 citations on file for this inspection.
1910.23 A02
- Issued
- Jul 18, 2016
- Abate by
- Aug 1, 2016
- Penalty
- Initial $4,400 · Current $0 Reduced
General-duty citation text
29 CFR 1910.23(a)(2): Ladderway floor opening(s) or platform(s) were not guarded by a standard railing with standard toeboard(s) on all exposed sides (except at the entrance to opening) with passage through the railing either provided with a swinging gate or so offset that a person could walk directly into the opening. The employer allowed the barrier safety chain at the top of the ladder to be disconnected from its second connection point in the ladder opening at the time of the inspection, although no employees were on the subject platforms at the time of the onsite inspection. 4) Within the NGL Product area, the Product Separator had a vertical caged ladder 5) Within the NGL Product area, the Product Cooler had a vertical caged ladder 6) Within the NGL Product area, a caged ladder 7) The Hot Oil Heater
Recent events (2)
- — I (O) $0
- — Z (S) $4400
1910.119 F01
- Issued
- Jul 18, 2016
- Abate by
- Sep 1, 2016
- Penalty
- Initial $5,500 · Current $2,750 Reduced
General-duty citation text
29 CFR 1910.119(f)(1): The employer did not develop and implement written operating procedures that provided clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and addressing at least steps for each operating phase, safe operating limits, safety and health considerations, and safety systems and their functions as outlined by this paragraph. On or about 22 February 2016, the following written procedures were not produced for review: 1) For the Drain/SLOP Oil System, both the Normal Shutdown and Emergency Shutdown Operating Procedures were missing. 2) For the Gas Treating Facility, the Emergency Shutdown Operating Procedure was missing. 3) For the Instrument Air System, both the Emergency Shutdown and the Normal Startup Operating Procedures were missing. 4) For the Truck Loading/Unloading, the Shutdown, Normal Startup, and Initial/Turnaround Startup Operating Procedures were missing.
Recent events (2)
- — I (O) $2750
- — Z (S) $5500
1910.119 J04 III
- Issued
- Jul 18, 2016
- Abate by
- Sep 1, 2016
- Penalty
- Initial $3,300 · Current $1,650 Reduced
General-duty citation text
29 CFR 1910.119(j)(4)(iii): The frequency of inspections and tests of process equipment was not consistent with applicable manufacturers' recommendations and good engineering practices, and more frequently if determined to be necessary by prior operating experience. On or about 22 February 2016, approximately 18 piping circuits were overdue for thickness testing.
Recent events (2)
- — I (O) $1650
- — Z (S) $3300
1910.119 J05
- Issued
- Jul 18, 2016
- Abate by
- Aug 1, 2016
- Penalty
- Initial $5,500 · Current $2,750 Reduced
General-duty citation text
29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that were outside acceptable limits (defined by the process safety information on paragraph (d) of this section) before use. On or about 22 February 2016, and at times prior thereto, the employer did not replace pressure safety valves (PSV) that had been identified through 3rd party testing to have either failed or to have discrepancies, exposing personnel working within the process area to a fire and explosion hazard from the release of hydrocarbons or catastrophic rupture of a vessel. 3) PSV-5524 was tested on 2015/06/16. Comment section indicated PSV failed seat leakage and pop test; however, the valve was not replaced.
Recent events (2)
- — I (S) $2750
- — Z (S) $5500
1904.29 B01
- Issued
- Jul 18, 2016
- Abate by
- Sep 1, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1904.29(b)(1): A Log of all recordable work-related injuries and illnesses (OSHA Form 300 or equivalent) was not completed in the detail as required by the regulation. At the inspection site, for calendar years 2014 and 2015, two (2) cases on the OSHA 300 Log of Work-Related Injuries and Illnesses had incomplete information that affected understandability of the type of injury that occurred. 1) Calendar year 2014, Case# 5236 was missing a description in column F of the Log for the nature of the "injury or illness". 2) Calendar year 2015, Case# 6584 was missing a description in column F of the Log for the nature of the "injury or illness".
Recent events (2)
- — I (O) $0
- — Z (O) $0
1904.32 B06
- Issued
- Jul 18, 2016
- Abate by
- Sep 1, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1904.32(b)(6): The annual summary was not posted between February 1 of the year following the year covered by the records and kept in place until April 30 at the work site. At the inspection site, the employer did not sign and post the OSHA 300A Summary of Work-Related Injuries and Illnesses by February 1st of the following year within the workplace. 1) The Summary for calendar year 2014 had a signature date of 2/27/2015. 2) The Summary for calendar year 2015 had a signature date of 2/15/2016.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at DCP Midstream, LP
View DCP Midstream, LP's full OSHA safety record →
More inspections in this industry (NAICS 211112)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341283208.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.